Land-use permits in Redmond: fees, timeline & requirements (2026)

Everything you need to know about pulling a land-use / zoning permit in Redmond, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Redmond Planning and Community Development.

Look up your Redmond address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Redmond's source.

Permit required?
Always
Permit fee
Redmond's variance is $19,347.23 for a single-family or non-corporate applicant and $20,240.60 otherwise; an administrative modification is $13,169.26.
Review timeline
Not published by the city

When does land-use or zoning work need a permit in Redmond?

Triggered when a project does not conform to the strict letter of the zoning code. Variances require a hardship finding under most city codes. Design review thresholds vary (Seattle: most multifamily + non-residential >4,000 sq ft; many cities: design review only in designated districts).

From Redmond's own code

“This section has been amended by Ordinance 3085, which is pending one day after Evans Creek Relocation project construction. A. Establishment of Zoning Map. The designation, location and boundaries of the zones established by RZC 21.04.0010.A.2 are as shown and depicted on the Zoning Map(s) of the City, which shall be maintained as such and which are hereby incorporated by reference in this section and maintained electronically in the City ’s geographic information system and displayed on the City ’s website and other locations.”
Source ↗verified 2026-05-29

Required submittals

  • Narrative of request
  • Site plan
  • Design / elevation drawings if design review
  • SEPA checklist (if required)
  • Mailing labels for public notice

Review steps

  1. Intake completeness
  2. Staff review
  3. Public comment period
  4. Decision (admin or hearing examiner)

Who can do this work in Redmond?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Redmond and King County. Kolmo prepares the drawings and submittals, files the land-use / zoning permit with Redmond Planning and Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Redmond land-use / zoning quote.

Notes & caveats

Issuing body is city planning, not building. Land-use approvals precede building permits and have their own SEPA threshold review. Process timelines run weeks to months; public notice + hearing examiner involvement is common.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your land-use or zoning work in Redmond — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: the 5 documents under Required submittals above.
  3. 3. Submit through the city portal: Redmond Planning and Community Development ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay the review fees (Redmond's fee schedule sets them) and keep the decision with the project.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Redmond Planning and Community Development, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Land-use permits in Redmond — FAQ

When does land-use or zoning work need a permit in Redmond?

Triggered when a project does not conform to the strict letter of the zoning code. Variances require a hardship finding under most city codes. Design review thresholds vary (Seattle: most multifamily + non-residential >4,000 sqft; many cities: design review only in designated districts).

How much does a land-use / zoning permit cost in Redmond?

Redmond's variance is $19,347.23 for a single-family or non-corporate applicant and $20,240.60 otherwise; an administrative modification is $13,169.26. A pre-application meeting with Planning staff is $2,090.62, and a zoning verification letter $416.73. Where a project needs two land use permits and neither is marked 'in conjunction with another land use permit', only the higher fee applies. A 4% technology surcharge is added to every fee (Development Review Permit Fees, effective February 1, 2026). Apply through the Redmond ePermitting Service, REPS (https://cityofredmondwa-energovweb.tylerhost.net/apps/selfservice); plan-reviewed permits go through Plan Review Online, and the How to Apply page (https://www.redmond.gov/462/How-to-Apply) says which.