Siding permits in City of Redmond: fees, timeline & requirements (2026)

Everything you need to know about pulling a siding permit in City of Redmond, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Redmond uses ePlans portal..

Permit required?
Often no
Permit fee
Typically minimal fee — like-for-like usually exempt. Apply via https://eplans.redmond.gov.
Review timeline

When does a siding need a permit in City of Redmond?

2021 IRC R105.2(1)(g) exempts "ordinary repairs" — like-for-like siding replacement on existing structure. Permit required if changing structural sheathing, adding insulation that affects WSEC compliance, or modifying weather-resistive barrier (WRB) detailing.

Required submittals

  • if permit required: WRB + flashing details, fastener schedule, WSEC continuous insulation calc if added

Inspection sequence

  1. WRB / flashing inspection
  2. final

Contractor specialties needed

general

Notes & caveats

WRB required behind all siding (IRC R703.2). Flashing at openings, kick-out flashings at roof-wall intersections (R703.4) inspected when permit issued.

Siding permit fee estimate in City of Redmond

Worked example for a $18,000 siding project (building permit). Your actual fee scales with project valuation.

Building permit fee$293.25
Plan review$190.61
WA state surcharge$4.5
Estimated total$488.36

Typically minimal fee — like-for-like usually exempt. Apply via https://eplans.redmond.gov. Computed from the City of Redmond fee bracket schedule · source ↗. Impact/utility fees may apply separately.

How to apply

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Redmond siding — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (1).
  3. 3. Submit through the city portal: Redmond uses ePlans portal.
  4. 4. Track review (typical: ). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Typically minimal fee — like-for-like usually exempt. Apply via https://eplans.redmond.gov.) and pick up the permit. Inspection card travels with the job.

Siding permits in City of Redmond — FAQ

When does a siding need a permit in City of Redmond?

2021 IRC R105.2(1)(g) exempts "ordinary repairs" — like-for-like siding replacement on existing structure. Permit required if changing structural sheathing, adding insulation that affects WSEC compliance, or modifying weather-resistive barrier (WRB) detailing.

How much does a siding permit cost in City of Redmond?

For a $18,000 siding project, the estimated City of Redmond permit fee is about $488.36 — building fee $293.25 + plan review $190.61 + surcharges. Fees scale with project valuation per the city schedule.

City of Redmond resourcesPermit portal ↗Fee schedule ↗