Siding permits in Redmond: fees, timeline & requirements (2026)
Everything you need to know about pulling a siding permit in Redmond, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Redmond Planning and Community Development.
Free lookup, no account needed — the office that issues the permit at your address, cited to Redmond's source.
When does siding replacement need a permit in Redmond?
The state code exempts no siding replacement, and the local code adds no exemption: re-siding needs a permit. Patching a few boards without cutting into the wall is an ordinary repair.
How Redmond adopted this rule
The threshold comes from the state code (WAC 51.51), which Redmond adopts by reference in the provision quoted below.
“The 2021 edition of the International Residential Code as published by the International Code Council is hereby adopted by reference with the exceptions noted in WAC Chapter 51-51.”Source ↗verified 2026-10-02
Required submittals
- If permit required: WRB + flashing details, fastener schedule, WSEC continuous insulation calc if added
Inspection sequence
- WRB / flashing inspection
- Final
Contractor specialties needed
General contractor
Who can do this work in Redmond?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Redmond and King County. Kolmo prepares the drawings and submittals, files the siding permit with Redmond Planning and Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Redmond siding quote.
Notes & caveats
WRB required behind all siding (IRC R703.2). Flashing at openings, kick-out flashings at roof-wall intersections (R703.4) inspected when permit issued.
Siding permit fee estimate in Redmond
Worked example for an $18,000 siding project (building permit). Your actual fee scales with project valuation.
| Building permit fee | $584.66 |
| Plan review | $380.03 |
| Technology surcharge | $38.59 |
| WA state surcharge | $6.50 |
| Estimated total | $1,009.78 |
Redmond prices a re-siding job's building permit on the value of the work: $46.89 up to $500, $46.89 for the first $500 plus $6.08 for each $100 more up to $2,000, $138.26 for the first $2,000 plus $27.90 for each $1,000 more up to $25,000, and $781.12 for the first $25,000 plus $20.17 for each $1,000 more up to $50,000. Plan review is 65% of that fee. A 4% technology surcharge applies to the total, plus the $6.50 state building code fee (2026 fee schedules). Apply through the Redmond ePermitting Service, REPS (cityofredmondwa-energovweb.tylerhost.net/
How to apply yourself
- 1. Check who issues the permit. Run an address lookup for your siding replacement in Redmond — we'll confirm which office issues the permit at that address.
- 2. Assemble submittals: what Required submittals above lists.
- 3. Submit through the city portal: Redmond Planning and Community Development ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (about $1,010 for an $18,000 project) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Redmond Planning and Community Development, handles reviewer comments, and builds the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Siding permits in Redmond — FAQ
When does siding replacement need a permit in Redmond?
The state code exempts no siding replacement, and the local code adds no exemption: re-siding needs a permit. Patching a few boards without cutting into the wall is an ordinary repair.
How much does a siding permit cost in Redmond?
For a $18,000 siding project, the estimated Redmond permit fee is about $1,009.78 (building fee $584.66 + plan review $380.03 + surcharges) from Redmond's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.
