Fence permits in Shoreline: fees, timeline & requirements (2026)

Everything you need to know about pulling a fence permit in Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline Planning & Community Development.

Look up your Shoreline address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Shoreline's source.

Permit required?
Permit if: taller than 7 ft.
Permit fee
About $447 for a $6,000 project, when a permit is needed
Review timeline
Not published by the city · OTC eligible

When does a fence need a permit in Shoreline?

Shoreline's Construction Permit FAQ states a construction permit is not needed for "fences six feet high or lower." SMC 20.50.190 caps side/rear-yard fence height at 6 feet; front-yard fences are limited to 3 feet 6 inches and no more than 60 percent opaque. Chain-link/barbed/razor/electric fences are prohibited. Critical-area overlays (Chapter 20.80) trigger additional review.

In the source's own words

“The maximum height of fences located along a side and/or rear yard property line shall be six feet.”
Source ↗verified 2026-05-29

What Shoreline says in its own permit handout

From Fences (dated 6/2026), published by Shoreline. This is the jurisdiction's own guidance on its permit process, not the ordinance text — where the two differ, the code governs.

“No permit is required, unless the fence is over seven feet high or the fence is located in an environmentally critical area, such as near a steep slope, stream, or wetland.”
Handout ↗read 2026-09-05

Required submittals

  • Site plan w/ heights and setbacks (if permit required)

Inspection sequence

  1. Final (if permit required)

Contractor specialties needed

General contractor

Who can do this work in Shoreline?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Shoreline and King County. Kolmo prepares the drawings and submittals, files the fence permit with Shoreline Planning & Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Shoreline fence quote.

Notes & caveats

A fence over 7 ft needs a building permit: IRC R105.2 item 2, which SMC 15.05.010(B) adopts and 15.05.040(A) leaves as the State adopts it, and the City's fence handout says the same. Six feet is the zoning code's height cap for a fence along a property line (SMC 20.50.110 A; 20.50.190 B in single-family attached development), which a permit does not lift, and a property-line fence is subject to the sight clearance provisions of the Engineering Development Manual (20.50.110 A).

Fence permit fee estimate in Shoreline

Worked example for a $6,000 fence project (building permit). Your actual fee scales with project valuation.

Building permit fee$267
Plan review$173.55
WA state surcharge$6.50
Estimated total$447.05

A fence that needs a building permit in Shoreline is priced on its value, as supplied by the applicant or contractor: $267 up to $16,000, and $75 for the first $2,000 plus $14 for each $1,000 more up to $25,000, with plan review at 65% of that fee. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account). Computed from Shoreline's adopted fee schedule · source ↗. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your fence in Shoreline — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: what Required submittals above lists.
  3. 3. Submit through the city portal: Shoreline Planning & Community Development ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (about $447 for a $6,000 project) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Shoreline Planning & Community Development, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Fence permits in Shoreline — FAQ

When does a fence need a permit in Shoreline?

Shoreline's Construction Permit FAQ states a construction permit is not needed for "fences six feet high or lower." SMC 20.50.190 caps side/rear-yard fence height at 6 feet; front-yard fences are limited to 3 feet 6 inches and no more than 60 percent opaque. Chain-link/barbed/razor/electric fences are prohibited. Critical-area overlays (Chapter 20.80) trigger additional review.

How much does a fence permit cost in Shoreline?

For a $6,000 fence project, the estimated Shoreline permit fee is about $447.05 (building fee $267 + plan review $173.55 + surcharges) from Shoreline's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.