Flooring permits in Shoreline: fees, timeline & requirements (2026)
Everything you need to know about pulling a flooring permit in Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline Planning & Community Development.
Free lookup, no account needed — the office that issues the permit at your address, cited to Shoreline's source.
When does new flooring need a permit in Shoreline?
Floor finish work (tiling, carpeting) is exempt finish work — no construction permit required.
In the source's own words
“wallpapering, painting or similar finish work”Source ↗verified 2026-09-19
Contractor specialties needed
General contractor
Who can do this work in Shoreline?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Shoreline and King County. Kolmo prepares the drawings and submittals, files the flooring permit with Shoreline Planning & Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Shoreline flooring quote.
Notes & caveats
Radiant in-floor heat is a mechanical permit (electric) or plumbing permit (hydronic).
Flooring permit fee estimate in Shoreline
Worked example for a $6,000 flooring project (building permit). Your actual fee scales with project valuation.
| Building permit fee | $267 |
| Plan review | $173.55 |
| WA state surcharge | $6.50 |
| Estimated total | $447.05 |
Where flooring work needs a building permit in Shoreline, such as work on the floor structure, it is priced on the value of the work: $267 up to $16,000, with plan review at 65% of that fee. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/
How to apply yourself
- 1. Check who issues the permit. Run an address lookup for your new flooring in Shoreline — we'll confirm which office issues the permit at that address.
- 2. Assemble submittals: the application and what it asks for, as Shoreline Planning & Community Development lists them.
- 3. Submit through the city portal: Shoreline Planning & Community Development ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (about $447 for a $6,000 project) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Shoreline Planning & Community Development, handles reviewer comments, and builds the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Flooring permits in Shoreline — FAQ
When does new flooring need a permit in Shoreline?
Floor finish work (tiling, carpeting) is exempt finish work — no construction permit required.
How much does a flooring permit cost in Shoreline?
For a $6,000 flooring project, the estimated Shoreline permit fee is about $447.05 (building fee $267 + plan review $173.55 + surcharges) from Shoreline's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.