Land-use permits in Shoreline: fees, timeline & requirements (2026)
Everything you need to know about pulling a land-use / zoning permit in Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline Planning & Community Development.
Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Shoreline's source.
When does land-use or zoning work need a permit in Shoreline?
Triggered when a project does not conform to the strict letter of the zoning code. Variances require a hardship finding under most city codes. Design review thresholds vary (Seattle: most multifamily + non-residential >4,000 sq ft; many cities: design review only in designated districts).
From Shoreline's own code
“Except for subdivisions, master development plans and special use permits for public agency uses or where a different duration of approval is indicated in this Code, vested status of an approved land use permit under Type A, B, and C actions shall expire two years from the date of the City’s final decision, unless a complete building permit application is filed before the end of the two-year term. In the event of an administrative or judicial appeal, the two-year term shall not expire. Continuance of the two-year period may be reinstated upon resolution of the appeal.”Source ↗verified 2026-05-17
Required submittals
- Narrative of request
- Site plan
- Design / elevation drawings if design review
- SEPA checklist (if required)
- Mailing labels for public notice
Review steps
- Intake completeness
- Staff review
- Public comment period
- Decision (admin or hearing examiner)
Who can do this work in Shoreline?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Shoreline and King County. Kolmo prepares the drawings and submittals, files the land-use / zoning permit with Shoreline Planning & Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Shoreline land-use / zoning quote.
Notes & caveats
Issuing body is city planning, not building. Land-use approvals precede building permits and have their own SEPA threshold review. Process timelines run weeks to months; public notice + hearing examiner involvement is common.
How to apply yourself
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your land-use or zoning work in Shoreline — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
- 2. Assemble submittals: the 5 documents under Required submittals above.
- 3. Submit through the city portal: Shoreline Planning & Community Development ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay the review fees (Shoreline's fee schedule sets them) and keep the decision with the project.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Shoreline Planning & Community Development, handles reviewer comments, and builds the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Land-use permits in Shoreline — FAQ
When does land-use or zoning work need a permit in Shoreline?
Triggered when a project does not conform to the strict letter of the zoning code. Variances require a hardship finding under most city codes. Design review thresholds vary (Seattle: most multifamily + non-residential >4,000 sqft; many cities: design review only in designated districts).
How much does a land-use / zoning permit cost in Shoreline?
Shoreline's zoning variance is $12,093 and a conditional use permit $9,960; an interpretation of the development code is $998, a lot line adjustment $2,136, and critical areas review is billed at the $267 hourly rate with a 2-hour minimum. Along the shoreline, an exemption is $668 and a substantial development permit $3,557 up to $10,000 of value. A pre-application meeting is $267. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (https://www.shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account).