Siding permits in Shoreline: fees, timeline & requirements (2026)
Everything you need to know about pulling a siding permit in Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline Planning & Community Development.
Free lookup, no account needed — the office that issues the permit at your address, cited to Shoreline's source.
When does siding replacement need a permit in Shoreline?
The state code exempts no siding replacement, and the local code adds no exemption: re-siding needs a permit. Patching a few boards without cutting into the wall is an ordinary repair.
How Shoreline adopted this rule
The threshold comes from the state code, which Shoreline adopts by reference in the provision quoted below.
“The current edition of the International Residential Code published by the International Code Council, Inc., as adopted by the Washington State Building Code Council in Chapter 51-51 WAC, as now or hereafter amended.”Source ↗verified 2026-10-02
Required submittals
- If permit required: WRB + flashing details, fastener schedule, WSEC continuous insulation calc if added
Inspection sequence
- WRB / flashing inspection
- Final
Contractor specialties needed
General contractor
Who can do this work in Shoreline?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Shoreline and King County. Kolmo prepares the drawings and submittals, files the siding permit with Shoreline Planning & Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Shoreline siding quote.
Notes & caveats
Per Residential Interior Remodel checklist scope statement: "limited siding repair... does not require a Building Permit." Full re-side, or work affecting envelope insulation (WSEC R402), requires a Building Permit; use the Residential Additions checklist when exterior envelope is altered.
Siding permit fee estimate in Shoreline
Worked example for an $18,000 siding project (building permit). Your actual fee scales with project valuation.
| Building permit fee | $299 |
| Plan review | $194.35 |
| WA state surcharge | $6.50 |
| Estimated total | $499.85 |
Where a re-siding job needs a building permit in Shoreline, it is priced on the value of the work, as supplied by the applicant or contractor: $267 up to $16,000, $75 for the first $2,000 plus $14 for each $1,000 more up to $25,000, and $397 for the first $25,000 plus $11 for each $1,000 more up to $50,000. Plan review is 65% of that fee, plus the $6.50 state building code fee. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/
How to apply yourself
- 1. Check who issues the permit. Run an address lookup for your siding replacement in Shoreline — we'll confirm which office issues the permit at that address.
- 2. Assemble submittals: what Required submittals above lists.
- 3. Submit through the city portal: Shoreline Planning & Community Development ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (about $500 for an $18,000 project) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Shoreline Planning & Community Development, handles reviewer comments, and builds the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Siding permits in Shoreline — FAQ
When does siding replacement need a permit in Shoreline?
The state code exempts no siding replacement, and the local code adds no exemption: re-siding needs a permit. Patching a few boards without cutting into the wall is an ordinary repair.
How much does a siding permit cost in Shoreline?
For a $18,000 siding project, the estimated Shoreline permit fee is about $499.85 (building fee $299 + plan review $194.35 + surcharges) from Shoreline's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.