Signs permits in Shoreline: fees, timeline & requirements (2026)
Everything you need to know about pulling a sign permit in Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline Planning & Community Development.
Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Shoreline's source.
When does a sign need a permit in Shoreline?
Shoreline requires a sign permit, approving the sign's size, design, location and display, before any temporary or permanent sign is constructed, installed, posted, displayed or modified, except as its sign code provides (SMC 20.50.532(A)). Ordinary maintenance and repair, and changes to the graphics or copy that leave the sign's size, structure and height alone, need no permit (SMC 20.50.532(B)). Allowed temporary signs need no permit unless SMC 20.50.600 says otherwise, and the exempt signs of SMC 20.50.610 include a real estate sign on the parcel of up to 4 square feet and 5 feet tall in a residential zone.
From Shoreline's own code
“Except as provided in this chapter, no temporary or permanent sign may be constructed, installed, posted, displayed or modified without first obtaining a sign permit”Source ↗verified 2026-10-24
What Shoreline says in its own permit handout
From Sign Standards (dated 6/2026), published by Shoreline. This is the jurisdiction's own guidance on its permit process, not the ordinance text — where the two differ, the code governs.
“Window signs are allowed in all zones. They can be as big as 25% of the total window area. If they're not illuminated, then no permit is required.”Handout ↗read 2026-09-05
Required submittals
- Site / elevation plan
- Sign drawing with dimensions + materials
- Structural calc if freestanding
- Electrical detail if illuminated
Inspection sequence
- Footing if freestanding
- Electrical rough-in if illuminated
- Final
Contractor specialties needed
General contractor · Electrician (journey-level 01 or residential 02)
Who can do this work in Shoreline?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Shoreline and King County. Kolmo prepares the drawings and submittals, files the sign permit with Shoreline Planning & Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Shoreline sign quote.
Notes & caveats
Issuing body is city building dept (structural review) often with planning sign-off (zoning compliance). Electrical permit required for illuminated signs. Historic-district signs get separate review.
How to apply yourself
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your sign in Shoreline — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
- 2. Assemble submittals: the 4 documents under Required submittals above.
- 3. Submit through the city portal: Shoreline Planning & Community Development ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (Shoreline's fee schedule sets them) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Shoreline Planning & Community Development, handles reviewer comments, and builds the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Signs permits in Shoreline — FAQ
When does a sign need a permit in Shoreline?
Shoreline requires a sign permit, approving the sign's size, design, location and display, before any temporary or permanent sign is constructed, installed, posted, displayed or modified, except as its sign code provides (SMC 20.50.532(A)). Ordinary maintenance and repair, and changes to the graphics or copy that leave the sign's size, structure and height alone, need no permit (SMC 20.50.532(B)). Allowed temporary signs need no permit unless SMC 20.50.600 says otherwise, and the exempt signs of SMC 20.50.610 include a real estate sign on the parcel of up to 4 square feet and 5 feet tall in a residential zone.
How much does a sign permit cost in Shoreline?
Shoreline's sign permit is $570 for a building-mounted, awning or driveway sign and $1,140 for a monument or pole sign. Wiring a lit sign needs an L&I electrical permit, at L&I's fees. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (https://www.shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account).
