Arched Entryway Drywall and Paint — Federal Way

Federal Way, WA
August 2026
outdoor

About This Project

Kolmo Construction closed in a covered arched entryway at a Federal Way, WA home where the framing and OSB sheathing had been left exposed. The crew cut and fit moisture-resistant board to both arched openings, wrapped the returns, and set corner bead on every outside corner, then taped, finished and sanded the radius smooth. Primer and two coats of paint took the entry from bare sheathing to a clean charcoal archway framing the flagstone walkway and cedar ceiling.

Bare Sheathing to a Finished Charcoal Archway in Federal Way

  • Exposed OSB sheathing closed in with moisture-resistant board, including the returns on both arched openings
  • Corner bead at every outside corner, taped and sanded to a smooth arch radius
  • Primed and finished with two coats of paint

Project Gallery

Project Details

Location
Federal Way, WA
Category
outdoor
Completion Date
August 21, 2026

Ready to Start Your Project?

Get a free consultation and quote for your remodeling project.

More Projects