About This Project
Kolmo Construction remodeled the basement of a 1939 house in the Broadview neighborhood of north Seattle, replacing its knob-and-tube wiring and rebuilding the basement bathroom. New attic insulation could not go in over the old wiring, so the knob-and-tube came out first, from the basement to the attic. The new wiring went in under a City of Seattle electrical permit, and the City inspected it before the basement walls were closed. Then the attic got new insulation, and the basement was finished with drywall, texture and paint, recessed lights, new interior doors, and wood-look vinyl plank flooring carried up the stairs with a matching stair nose. The bathroom was rebuilt around a wider shower, tiled in large-format porcelain over a waterproofing membrane, with a framed sliding glass door and a new vanity. Upstairs, a section of the red oak kitchen floor was patched under the refrigerator. The upper deck was resurfaced in composite boards in the same job, shown on its own page, Composite Deck Resurfacing — Seattle. Work started July 29 and was finished November 11, 2026.
Knob-and-Tube Out, a Finished Basement In
- ✓Knob-and-tube wiring replaced from the basement to the attic, under a City of Seattle electrical permit
- ✓New wiring inspected by the City before the walls were closed
- ✓New attic insulation once the old wiring was out
- ✓Basement finished with drywall, texture, paint, recessed lights and new interior doors
- ✓Wood-look vinyl plank flooring through the basement and up the stairs, with a matching stair nose
- ✓Bathroom rebuilt around a wider shower: large-format porcelain over a waterproofing membrane, a framed sliding glass door and a new vanity
- ✓Red oak kitchen floor patched under the refrigerator
- ✓Upper deck resurfaced in composite boards in the same job