Fence permits in City of Bellevue: fees, timeline & requirements (2026)
Everything you need to know about pulling a fence permit in City of Bellevue, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Bellevue Development Services.
Permit required?
Often no
Permit fee
Typically no fee unless permit required. Apply via https://mybuildingpermit.com.
Review timeline
— · OTC eligible
When does a fence need a permit in City of Bellevue?
Bellevue LUC 20.20.460: max 6ft front yard, 8ft side/rear yard. Permit required if exceeding standard heights or for fences in critical areas.
Required submittals
- site plan w/ heights and setbacks (if permit required)
Inspection sequence
- final (if permit required)
Contractor specialties needed
general
Notes & caveats
Sight-distance triangle at intersections + driveways per LUC.
How to apply
- 1. Confirm your parcel's zoning & overlays. Run an address lookup on the main permits page — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
- 2. Assemble submittals (1).
- 3. Submit through the city portal: Bellevue Development Services ↗
- 4. Track review (typical: —). Respond to reviewer comments promptly.
- 5. Pay issuance fees (Typically no fee unless permit required. Apply via https://mybuildingpermit.com.) and pick up the permit. Inspection card travels with the job.
