HVAC permits in City of Bellevue: fees, timeline & requirements (2026)
Everything you need to know about pulling a HVAC / mechanical permit in City of Bellevue, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Bellevue Development Services.
Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Bellevue's source.
When does a HVAC / mechanical need a permit in City of Bellevue?
A permit is required for installing, moving, or replacing a furnace and/or heat pump (and an air conditioner also needs an electrical permit).
In the source's own words
“A permit is required for installing, moving or replacing a furnace and/or heat pump.”Source ↗verified 2026-09-24
Required submittals
- equipment specs (model #, capacity)
- Manual J/S/D for new system
- gas piping diagram if applicable
- electrical permit cross-reference
Inspection sequence
- rough-in / gas pressure test
- final
Contractor specialties needed
mechanical
Who can do this work in City of Bellevue?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Bellevue and King County. Kolmo prepares the drawings and submittals, files the HVAC / mechanical permit with Bellevue Development Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Bellevue HVAC / mechanical quote.
Notes & caveats
Heat pump or AC condensate must drain per IMC. Combustion appliance: combustion air, venting, gas piping leak test. WA HB 1185 (HEEHRA): heat-pump rebates available through energy.wa.gov.
How to apply yourself
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Bellevue HVAC / mechanical — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
- 2. Assemble submittals (4).
- 3. Submit through the city portal: Bellevue Development Services ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (Mechanical permit + electrical permit (if new circuit) + plumbing permit (if condensate to drain). Apply via https://mybuildingpermit.com.) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
We pull HVAC / mechanical permits in City of Bellevue every month. We prepare the drawings and submittals, file with Bellevue Development Services, handle reviewer comments, and build the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
HVAC permits in City of Bellevue — FAQ
When does a HVAC / mechanical need a permit in City of Bellevue?
A permit is required for installing, moving, or replacing a furnace and/or heat pump (and an air conditioner also needs an electrical permit).
How much does a HVAC / mechanical permit cost in City of Bellevue?
Current fee per the City of Bellevue fee schedule: Mechanical permit + electrical permit (if new circuit) + plumbing permit (if condensate to drain). Apply via https://mybuildingpermit.com.. Plus ancillary plan-review/tech-surcharge fees per city schedule.
