Signs permits in Bellevue: fees, timeline & requirements (2026)

Everything you need to know about pulling a sign permit in Bellevue, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Bellevue Development Services.

Look up your Bellevue address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Bellevue's source.

Permit required?
Always
Permit fee
Bellevue's land use review of a sign is $457, with or without a building permit, and $543 for a temporary sign; a sign permit carries a $53 operations fee, and a new circuit for a sign is a $79 electrical inspection (Ordinance 6879, Tables 2, 7 and 20).
Review timeline
Not published by the city

When does a sign need a permit in Bellevue?

Bellevue requires a City sign permit to erect, alter or relocate a sign (BCC 22B.10.160(A)). No permit is needed, though the sign must still meet the sign code, for a sign of 6 square feet or less (except a subdivision directional sign), for repainting, cleaning or repairing a permitted sign that leaves its structure and content unchanged, for copy changes on an approved reader board or marquee, for temporary political signs, or for real estate and estate sale signs that meet BCC 22B.10.120 (BCC 22B.10.160(D)).

From Bellevue's own code

“Except as provided in subsection D of this section, no sign governed by this code shall be erected, altered or relocated from and after the date of adoption of this code without a permit issued by the city.”
Source ↗verified 2026-10-24

Required submittals

  • Site / elevation plan
  • Sign drawing with dimensions + materials
  • Structural calc if freestanding
  • Electrical detail if illuminated

Inspection sequence

  1. Footing if freestanding
  2. Electrical rough-in if illuminated
  3. Final

Contractor specialties needed

General contractor · Electrician (journey-level 01 or residential 02)

Who can do this work in Bellevue?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Bellevue and King County. Kolmo prepares the drawings and submittals, files the sign permit with Bellevue Development Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Bellevue sign quote.

Notes & caveats

Issuing body is city building dept (structural review) often with planning sign-off (zoning compliance). Electrical permit required for illuminated signs. Historic-district signs get separate review.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your sign in Bellevue — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: the 4 documents under Required submittals above.
  3. 3. Submit through the city portal: Bellevue Development Services ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Bellevue's fee schedule sets them) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Bellevue Development Services, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Signs permits in Bellevue — FAQ

When does a sign need a permit in Bellevue?

Bellevue requires a City sign permit to erect, alter or relocate a sign (BCC 22B.10.160(A)). No permit is needed, though the sign must still meet the sign code, for a sign of 6 square feet or less (except a subdivision directional sign), for repainting, cleaning or repairing a permitted sign that leaves its structure and content unchanged, for copy changes on an approved reader board or marquee, for temporary political signs, or for real estate and estate sale signs that meet BCC 22B.10.120 (BCC 22B.10.160(D)).

How much does a sign permit cost in Bellevue?

Bellevue's land use review of a sign is $457, with or without a building permit, and $543 for a temporary sign; a sign permit carries a $53 operations fee, and a new circuit for a sign is a $79 electrical inspection (Ordinance 6879, Tables 2, 7 and 20). Apply via https://mybuildingpermit.com.