- Home
- Commercial Services
- Parks, Recreation & Public Space Construction
Parks, Recreation & Public Space Construction
Restroom facilities, shelters, ADA trail and pathway improvements and recreation building renovations for parks departments, port authorities and public agencies.
Kolmo Construction builds and renovates public amenities for parks departments, port authorities and recreation agencies across King, Pierce and Snohomish counties — accessible restroom facilities, shelter and pavilion construction, recreation and community building renovations, ADA trail and pathway improvements, and public space finish work. Kolmo holds WA contractor registration KOLMOL*753JS and WA State SEDBE certification #D700031098.
These are delivered as prevailing wage public works contracts with certified payroll filed direct to L&I PWIA. Kolmo is registered on the MRSC Small Works Roster with 238 public agencies selected across King, Pierce and Snohomish counties, and is King County SCS certified (#7259), which is the route most parks and recreation work at or under the RCW 39.04.155 threshold of $350,000 is awarded through.
On outdoor accessible routes the governing constraints are running slope, cross slope, surface firmness and stability, and clear width — and on an existing trail the binding constraint is almost always cross slope on existing grade, not the running slope that gets measured first. Kolmo surveys the existing route before pricing so the remediation scope reflects the actual grade. A trail project that discovers its real cross slope mid-construction discovers its real cost at the same time.
Park facilities are used year-round and often cannot be closed outright. Work is phased so a site keeps functioning where possible, with the accessible route maintained through construction and public separation from the work zone treated as a safety requirement rather than a courtesy.
Licensed & certified in Washington
- Washington State Contractor Registration — KOLMOL*753JS
- WA State SEDBE (Small Economically Disadvantaged Business Enterprise) — D700031098
- King County Small Contractor & Supplier (SCS) — 7259
- WA Lead-Safe RRP Firm — R25-0269
What this covers
- Accessible public restroom facilities
- Shelter & pavilion construction
- Recreation & community building renovations
- ADA trail & pathway improvements
- Existing-grade survey before scope pricing
- Public space finish work
- Prevailing wage & certified payroll to L&I PWIA
- MRSC Small Works Roster — 238 agencies
How the work runs
Site and existing-grade survey
Kolmo surveys the existing conditions before pricing — for trails and outdoor routes that means running slope, cross slope, surface condition and clear width along the whole route, not at sample points. Cross slope on existing grade is the constraint that most often drives the real scope, and it cannot be assumed from a drawing.
Roster response or formal bid
Work at or under the RCW 39.04.155 threshold is quoted through the agency's small works roster; larger contracts go through the formal bid process. Labor is priced from current L&I prevailing wage rates by trade and county, and bidder responsibility criteria are confirmed before pricing rather than after award.
Permitting and agency preconstruction
Kolmo files the required permits and runs preconstruction with the agency — submittals, schedule, site access and public safety planning. Where the site stays open to the public, separation, signage and maintenance of an accessible route through the works are agreed before mobilization.
Construction with the site in public use
Work is phased so the park or facility keeps functioning wherever that is possible, with the work zone secured and separated from public circulation and an accessible route maintained throughout. Progress is documented with dated photographs at each phase handover to the agency.
Verification, closeout and affidavits
Completed accessible routes are re-measured against the governing dimensions and documented with the as-built figures. Closeout includes the Affidavit of Wages Paid, final inspection sign-off, warranties and as-built information, since retainage release depends on that record being complete.
Parks, Recreation & Public Space Construction — common questions
What kind of parks and recreation work does Kolmo take on?
Accessible public restroom facilities, shelter and pavilion construction, recreation and community building renovations, ADA trail and pathway improvements, and public space finish work for parks departments, port authorities and recreation agencies across King, Pierce and Snohomish counties. Kolmo delivers these as prevailing wage public works contracts with certified payroll filed to L&I.
How is accessibility handled on trails and outdoor public spaces?
Outdoor accessible routes are governed by running slope, cross slope, surface firmness and stability, and clear width — and on a trail the binding constraint is usually cross slope on existing grade rather than the running slope everyone measures first. Kolmo surveys the existing route before pricing so the remediation scope reflects the actual grade, not an assumed one, which is what keeps a trail project from discovering its real cost mid-construction.
Does Kolmo work for park districts outside King County?
Yes. Kolmo's MRSC Small Works Roster registration covers 238 public agencies across King, Pierce and Snohomish counties, and its Washington contractor registration, SEDBE certification and prevailing wage compliance apply statewide. Kolmo works throughout the Puget Sound region; work outside Washington is not offered.
Other commercial services
- Office Build-Outs & Tenant Improvements
- Retail Space Construction & Fit-Out
- Restaurant & Commercial Kitchen Renovations
- Medical & Dental Office Construction
- Industrial Facility Renovations
- ADA Compliance & Accessibility Upgrades
- Municipal & Government Facility Renovations
- School & Educational Facility Improvements
