Basement finish permits in City of Everett: fees, timeline & requirements (2026)

Everything you need to know about pulling a basement finish permit in City of Everett, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Everett Planning Department.

Look up your City of Everett address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Everett's source.

Permit required?
Always
Permit fee
Plan-review fee scales with valuation. State surcharge $6.50.
Review timeline
14–30 days

When does a basement finish need a permit in City of Everett?

2021 IRC R310: every sleeping room below grade requires emergency escape and rescue opening (egress window). Min sill height 44in, min net clear opening 5.7 sq ft (5.0 grade-floor), min width 20in, height 24in. Ceiling height min 7ft (R305). Entire newly conditioned area must comply with WSEC R402.

How City of Everett adopted this rule

The threshold comes from the state code (WAC 51.51), which City of Everett adopts by reference in the provision quoted below.

“A. Amendments applicable to adopted codes: 1. Any reference to the “Everett building code,” “Everett mechanical code,” “Everett fire code,” “Everett plumbing code,” “Everett electrical code,” and “Everett energy code,” in the Everett Municipal Code or elsewhere, refers to the corresponding code adopted pursuant to Section 16.005.030 . 2. Unless the context requires otherwise, any reference to a code adopted pursuant to Section 16.005.030 refers to that code as adopted herein. 3.”
Source ↗verified 2026-04-26

Required submittals

  • floor plan w/ egress windows + ceiling heights
  • electrical layout
  • plumbing diagram
  • mechanical / HVAC plan
  • WSEC compliance form (newly conditioned space)
  • smoke/CO alarm locations

Inspection sequence

  1. rough-in (electrical/plumbing/mechanical)
  2. framing
  3. insulation
  4. drywall
  5. final

Contractor specialties needed

general, electrical-01-or-02, plumbing, mechanical

Who can do this work in City of Everett?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Everett and Snohomish County. Kolmo prepares the drawings and submittals, files the basement finish permit with Everett Planning Department, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Everett basement finish quote.

Notes & caveats

Construction permit required for any habitable space addition. Smoke + CO alarms required (R314, R315). Any new circuits, plumbing fixtures, or HVAC requires trade permits.

Basement finish permit fee — Washington baseline, not City of Everett's own schedule

Worked example for a $40,000 basement finish project (building permit). Your actual fee scales with project valuation.

Building permit fee$542.75
Plan review$352.79
WA state surcharge$6.5
Estimated total$902.04

Plan-review fee scales with valuation. State surcharge $6.50. We have not read City of Everett's adopted fee schedule, so this is not City of Everett's fee: it walks the standard valuation table most Washington cities adopt by reference, as a rough guide. The real numbers are in City of Everett's fee schedule ↗. Impact/utility fees may apply separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Everett basement finish — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (6).
  3. 3. Submit through the city portal: Everett Planning Department ↗
  4. 4. Track review (typical: 14–30 days). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Plan-review fee scales with valuation. State surcharge $6.50.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull basement finish permits in City of Everett every month. We prepare the drawings and submittals, file with Everett Planning Department, handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Basement finish permits in City of Everett — FAQ

When does a basement finish need a permit in City of Everett?

2021 IRC R310: every sleeping room below grade requires emergency escape and rescue opening (egress window). Min sill height 44in, min net clear opening 5.7 sq ft (5.0 grade-floor), min width 20in, height 24in. Ceiling height min 7ft (R305). Entire newly conditioned area must comply with WSEC R402.

How much does a basement finish permit cost in City of Everett?

For a $40,000 basement finish project, the estimated City of Everett permit fee is about $902.04 — building fee $542.75 + plan review $352.79 + surcharges. Fees scale with project valuation per the city schedule.

How long does City of Everett take to review a basement finish permit?

Typical review window: 14–30 days.

City of Everett resourcesPermit portal ↗Fee schedule ↗