Land-use permits in Everett: fees, timeline & requirements (2026)

Everything you need to know about pulling a land-use / zoning permit in Everett, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Everett Public Works — Permit Services.

Look up your Everett address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Everett's source.

Permit required?
Always
Permit fee
Everett's 2026 Planning, Zoning and Land Use Fee Schedule lists a pre-application meeting at $730, Review Process I actions at $730, II at $1,092 and III at $2,370, a variance in a single-family zone at $1,092 (administrative variance $730), a boundary line adjustment at $1,458, a floodplain development permit at $1,587, a shoreline permit exemption letter at $730, SEPA review under one acre at $730, and a zoning verification letter at $145.
Review timeline
Not published by the city

When does land-use or zoning work need a permit in Everett?

Triggered when a project does not conform to the strict letter of the zoning code. Variances require a hardship finding under most city codes. Design review thresholds vary (Seattle: most multifamily + non-residential >4,000 sqft; many cities: design review only in designated districts).

From Everett's own code

“Adoption of a “planned development” overlay zone or a rezone or other zoning revision that is not of area-wide significance or general applicability, or other quasi-judicial permit decisions, which provide for a public hearing or meeting before the planning commission and an open public hearing before the city council. D. Legislative Decisions. Legislative decisions are not subject to the permit process procedures of this title.”
Source ↗verified 2026-04-26

Required submittals

  • Narrative of request
  • Site plan
  • Design / elevation drawings if design review
  • SEPA checklist (if required)
  • Mailing labels for public notice

Review steps

  1. Intake completeness
  2. Staff review
  3. Public comment period
  4. Decision (admin or hearing examiner)

Who can do this work in Everett?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Everett and Snohomish County. Kolmo prepares the drawings and submittals, files the land-use / zoning permit with Everett Public Works — Permit Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for an Everett land-use / zoning quote.

Notes & caveats

Issuing body is city planning, not building. Land-use approvals precede building permits and have their own SEPA threshold review. Process timelines run weeks to months; public notice + hearing examiner involvement is common.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your land-use or zoning work in Everett — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: the 5 documents under Required submittals above.
  3. 3. Submit through the city portal: Everett Public Works — Permit Services ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay the review fees (Everett's fee schedule sets them) and keep the decision with the project.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Everett Public Works — Permit Services, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Land-use permits in Everett — FAQ

When does land-use or zoning work need a permit in Everett?

Triggered when a project does not conform to the strict letter of the zoning code. Variances require a hardship finding under most city codes. Design review thresholds vary (Seattle: most multifamily + non-residential >4,000 sqft; many cities: design review only in designated districts).

How much does a land-use / zoning permit cost in Everett?

Everett's 2026 Planning, Zoning and Land Use Fee Schedule lists a pre-application meeting at $730, Review Process I actions at $730, II at $1,092 and III at $2,370, a variance in a single-family zone at $1,092 (administrative variance $730), a boundary line adjustment at $1,458, a floodplain development permit at $1,587, a shoreline permit exemption letter at $730, SEPA review under one acre at $730, and a zoning verification letter at $145. Concurrent applications pay each fee, and a 2.3% service fee applies to card payments.