Stormwater permits in City of Everett: fees, timeline & requirements (2026)

Everything you need to know about pulling a stormwater / drainage permit in City of Everett, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Everett Planning Department.

Look up your City of Everett address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Everett's source.

Permit required?
Always
Permit fee
Drainage review fees are commonly tiered by project size in the city's fee schedule.
Review timeline
Not published by the city

When does a stormwater / drainage need a permit in City of Everett?

Ecology's Stormwater Management Manual for Western Washington (SWMMWW, 2024 edition) is the state floor. A municipal stormwater permittee may instead adopt a REGIONAL manual Ecology has determined equivalent, and most do — some counties publish their own, some cities publish their own, and others adopt Ecology's directly. WHICH MANUAL APPLIES IS A PER-JURISDICTION FACT and it changes the numbers: review thresholds for new plus replaced impervious surface and for land-disturbing activity differ between manuals, so read this jurisdiction's own adopting chapter before quoting one. Critical-area and closed-basin parcels get stricter review under every manual.

From City of Everett's own code

“Exemptions to the minimum requirements for new and redevelopment are provided in the Stormwater Management Manual for Western Washington. In addition to those exemptions, project sites , or portions of project sites , that potentially contribute stormwater to the city’s latest designated combined sewer system (as set forth in EMC 14.08.040(B) ) shall not be subject to this chapter. The combined sewer system routes stormwater for treatment at the publicly owned treatment works.”
Source ↗verified 2026-04-26

Required submittals

  • drainage report (full or simplified)
  • site plan with impervious calc
  • BMP / facility detail
  • geotech if infiltration claimed

Inspection sequence

  1. pre-construction (BMPs in place)
  2. facility installation
  3. final stabilization

Contractor specialties needed

general

Who can do this work in City of Everett?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Everett and Snohomish County. Kolmo prepares the drawings and submittals, files the stormwater / drainage permit with Everett Planning Department, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Everett stormwater / drainage quote.

Notes & caveats

Issuing body is city public works / county DPER, often parallel to the building permit. On-site infiltration / detention required where infeasible to discharge to municipal storm. Critical-area parcels (steep slope, salmon-bearing watercourse) get more conservative review.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Everett stormwater / drainage — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Everett Planning Department ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Drainage review fees are commonly tiered by project size in the city's fee schedule.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull stormwater / drainage permits in City of Everett every month. We prepare the drawings and submittals, file with Everett Planning Department, handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Stormwater permits in City of Everett — FAQ

When does a stormwater / drainage need a permit in City of Everett?

Ecology's Stormwater Management Manual for Western Washington (SWMMWW, 2024 edition) is the state floor. A municipal stormwater permittee may instead adopt a REGIONAL manual Ecology has determined equivalent, and most do — some counties publish their own, some cities publish their own, and others adopt Ecology's directly. WHICH MANUAL APPLIES IS A PER-JURISDICTION FACT and it changes the numbers: review thresholds for new plus replaced impervious surface and for land-disturbing activity differ between manuals, so read this jurisdiction's own adopting chapter before quoting one. Critical-area and closed-basin parcels get stricter review under every manual.

How much does a stormwater / drainage permit cost in City of Everett?

Current fee per the City of Everett fee schedule: Drainage review fees are commonly tiered by project size in the city's fee schedule.. Plus ancillary plan-review/tech-surcharge fees per city schedule.

City of Everett resourcesPermit portal ↗Fee schedule ↗