Stormwater permits in Federal Way: fees, timeline & requirements (2026)

Everything you need to know about pulling a stormwater / drainage permit in Federal Way, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Federal Way Department of Community Development.

Look up your Federal Way address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Federal Way's source.

Permit required?
Always
Permit fee
Federal Way's Public Works development review fee for a single-family project is $340, and a clear-and-grade permit outside of a development is $1,742.
Review timeline
Not published by the city

When does drainage work need a permit in Federal Way?

Ecology's Stormwater Management Manual for Western Washington (SWMMWW, 2024 edition) is the state floor. A municipal stormwater permittee may instead adopt a regional manual Ecology has determined equivalent, and most do — some counties publish their own, some cities publish their own, and others adopt Ecology's directly. Which manual applies is a per-jurisdiction fact and it changes the numbers: review thresholds for new plus replaced impervious surface and for land-disturbing activity differ between manuals, so read this jurisdiction's own adopting chapter before quoting one. Critical-area and closed-basin parcels get stricter review under every manual.

From Federal Way's own code

“16.25.020 Drainage review. (1) When required. Drainage review is required for any proposed project, including new development and redevelopment (except for those proposing only routine maintenance, repair, or emergency modifications) which is or includes a regulated activity under FWRC 16.15.010, and for which city approval, including but not limited to any approval listed in FWRC 16.15.030, is required. (2) Type of drainage review required. One of the following four types of drainage review will be required, depending on the project;”
Source ↗verified 2026-09-06

Required submittals

  • Drainage report (full or simplified)
  • Site plan with impervious calc
  • BMP / facility detail
  • Geotech if infiltration claimed

Inspection sequence

  1. Pre-construction (BMPs in place)
  2. Facility installation
  3. Final stabilization

Contractor specialties needed

General contractor

Who can do this work in Federal Way?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Federal Way and King County. Kolmo prepares the drawings and submittals, files the stormwater / drainage permit with Federal Way Department of Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Federal Way stormwater / drainage quote.

Notes & caveats

Issuing body is city public works / county DPER, often parallel to the building permit. On-site infiltration / detention required where infeasible to discharge to municipal storm. Critical-area parcels (steep slope, salmon-bearing watercourse) get more conservative review.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your drainage work in Federal Way — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: the 4 documents under Required submittals above.
  3. 3. Submit through the city portal: Federal Way Department of Community Development ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Federal Way's fee schedule sets them) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Federal Way Department of Community Development, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Stormwater permits in Federal Way — FAQ

When does drainage work need a permit in Federal Way?

Ecology's Stormwater Management Manual for Western Washington (SWMMWW, 2024 edition) is the state floor. A municipal stormwater permittee may instead adopt a REGIONAL manual Ecology has determined equivalent, and most do — some counties publish their own, some cities publish their own, and others adopt Ecology's directly. WHICH MANUAL APPLIES IS A PER-JURISDICTION FACT and it changes the numbers: review thresholds for new plus replaced impervious surface and for land-disturbing activity differ between manuals, so read this jurisdiction's own adopting chapter before quoting one. Critical-area and closed-basin parcels get stricter review under every manual.

How much does a stormwater / drainage permit cost in Federal Way?

Federal Way's Public Works development review fee for a single-family project is $340, and a clear-and-grade permit outside of a development is $1,742. The surface water system development charge is $1,271.51 for a detached single-family house, and for other development $1,271.51 for each 3,200 sq ft of new impervious surface (2026 Fee Schedule, Sections Ten and Thirteen).

Federal Way resourcesPermit portal ↗Fee schedule ↗