Electrical permits in City of Kent: fees, timeline & requirements (2026)

Everything you need to know about pulling a electrical permit in City of Kent, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Kent uses MyKent permits portal..

Look up your City of Kent address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Kent's source.

Permit required?
Always
Permit fee
Electrical permit fees are set by circuit count and service size in the issuing agency's fee schedule. Apply via https://mybuildingpermit.com.
Review timeline
Not published by the city

When does a electrical need a permit in City of Kent?

Altering an electrical system requires a permit, but Kent does not issue residential electrical permits — those are issued and inspected by Washington State Labor & Industries.

In the source's own words

Altering a electrical, gas, mechanical or plumbing system.
Source ↗verified 2026-05-29

Required submittals

  • scope description
  • load calc for service changes
  • panel schedule for new panels

Inspection sequence

  1. rough-in
  2. service inspection (if applicable)
  3. final

Contractor specialties needed

electrical-01-or-02

Who can do this work in City of Kent?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Kent and King County. Kolmo prepares the drawings and submittals, files the electrical permit with Kent uses MyKent permits portal., carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Kent electrical quote.

Notes & caveats

Service upgrade: load calc per NEC 220. EV charger ≥40A: dedicated circuit + GFCI. AFCI required on most habitable-space circuits (NEC 210.12). Permit holder must hold L&I electrical contractor license (specialty 01 — general; 02 — residential ≤4 units; 03 — pump & irrigation; etc.).

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Kent electrical — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (3).
  3. 3. Submit through the city portal: Kent uses MyKent permits portal.
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Electrical permit fees are set by circuit count and service size in the issuing agency's fee schedule. Apply via https://mybuildingpermit.com.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull electrical permits in City of Kent every month. We prepare the drawings and submittals, file with Kent uses MyKent permits portal., handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Electrical permits in City of Kent — FAQ

When does a electrical need a permit in City of Kent?

Altering an electrical system requires a permit, but Kent does not issue residential electrical permits — those are issued and inspected by Washington State Labor & Industries.

How much does a electrical permit cost in City of Kent?

Current fee per the City of Kent fee schedule: Electrical permit fees are set by circuit count and service size in the issuing agency's fee schedule. Apply via https://mybuildingpermit.com.. Plus ancillary plan-review/tech-surcharge fees per city schedule.

City of Kent resourcesPermit portal ↗Fee schedule ↗