Stormwater permits in Kent: fees, timeline & requirements (2026)

Everything you need to know about pulling a stormwater / drainage permit in Kent, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Kent Economic and Community Development.

Look up your Kent address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Kent's source.

Permit required?
Always
Permit fee
Kent posts no drainage review fee: for Public Works fees, the City's permit page says to call Development Engineering at 253-856-5490.
Review timeline
Not published by the city

When does drainage work need a permit in Kent?

Ecology's Stormwater Management Manual for Western Washington (SWMMWW, 2024 edition) is the state floor. A municipal stormwater permittee may instead adopt a regional manual Ecology has determined equivalent, and most do — some counties publish their own, some cities publish their own, and others adopt Ecology's directly. Which manual applies is a per-jurisdiction fact and it changes the numbers: review thresholds for new plus replaced impervious surface and for land-disturbing activity differ between manuals, so read this jurisdiction's own adopting chapter before quoting one. Critical-area and closed-basin parcels get stricter review under every manual.

From Kent's own code

“A permit is required for all work to construct, install, modify, place, or attempt to construct, install, modify, or place any storm or surface water drainage structure or facility within the city and must be obtained before any work begins.”
Source ↗verified 2026-09-06

Required submittals

  • Drainage report (full or simplified)
  • Site plan with impervious calc
  • BMP / facility detail
  • Geotech if infiltration claimed

Inspection sequence

  1. Pre-construction (BMPs in place)
  2. Facility installation
  3. Final stabilization

Contractor specialties needed

General contractor

Who can do this work in Kent?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Kent and King County. Kolmo prepares the drawings and submittals, files the stormwater / drainage permit with Kent Economic and Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Kent stormwater / drainage quote.

Notes & caveats

Issuing body is city public works / county DPER, often parallel to the building permit. On-site infiltration / detention required where infeasible to discharge to municipal storm. Critical-area parcels (steep slope, salmon-bearing watercourse) get more conservative review.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your drainage work in Kent — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: the 4 documents under Required submittals above.
  3. 3. Submit through the city portal: Kent Economic and Community Development ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Kent's fee schedule sets them) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Kent Economic and Community Development, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Stormwater permits in Kent — FAQ

When does drainage work need a permit in Kent?

Ecology's Stormwater Management Manual for Western Washington (SWMMWW, 2024 edition) is the state floor. A municipal stormwater permittee may instead adopt a REGIONAL manual Ecology has determined equivalent, and most do — some counties publish their own, some cities publish their own, and others adopt Ecology's directly. WHICH MANUAL APPLIES IS A PER-JURISDICTION FACT and it changes the numbers: review thresholds for new plus replaced impervious surface and for land-disturbing activity differ between manuals, so read this jurisdiction's own adopting chapter before quoting one. Critical-area and closed-basin parcels get stricter review under every manual.

How much does a stormwater / drainage permit cost in Kent?

Kent posts no drainage review fee: for Public Works fees, the City's permit page says to call Development Engineering at 253-856-5490. Apply through the City of Kent Permit Portal (https://sso.kentwa.gov/).