Permit required?
Permit if: over 6 ft in a required setback or on a property line (variance and building permit) · taller than 7 ft (building permit) · over 4 ft in the front yard, outside the corner-lot and principal-arterial exceptions (above the zoning limit) · in a critical area or its buffer other than an aquifer recharge area (critical areas approval) · in shoreline jurisdiction (shoreline exemption approval) · in a flood hazard area (building permit and zoning certification, LMC 18A.50.030).
Permit fee
About $391 for a $6,000 project, when a permit is needed
Review timeline
Not published by the city · OTC eligible

When does a fence need a permit in Lakewood?

Permit NOT required for: front yard fences ≤4ft (unless along a principal arterial); rear yard fences ≤6ft. Permit required if exceeding these heights, or if located near or within a critical area, critical-area buffer, or Ordinary High-Water Mark.

Required submittals

  • Site plan w/ heights and setbacks (if permit required)

Inspection sequence

  1. Final (if permit required)

Contractor specialties needed

General contractor

Who can do this work in Lakewood?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Lakewood and Pierce County. Kolmo prepares the drawings and submittals, files the fence permit with Lakewood Planning and Public Works Department, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Lakewood fence quote.

Notes & caveats

From Lakewood handout B4: "Fences: Located on private property; Front yard fences – 4 feet high and under unless along a principal arterial; Rear yard fences - 6 feet high and under; Exceptions: If located near or within a critical area, a critical area buffer or Ordinary High-Water Mark may also trigger the need for permits." Lakewood's split front/rear thresholds (4ft/6ft) are stricter than typical 6ft/7ft baseline.

Fence permit fee estimate in Lakewood

Worked example for a $6,000 fence project (building permit). Your actual fee scales with project valuation.

Building permit fee$160
Plan review$120
Administrative base fee$90
Technology surcharge (4%)$14.80
WA state surcharge$6.50
Estimated total$391.30

A fence over 4 feet in a front yard or 6 feet in a rear yard, or near a critical area or the shoreline, needs a building permit in Lakewood, priced on the value of the work: $30 up to $500, $30 for the first $500 plus $4 for each $100 more up to $2,000, and $90 for the first $2,000 plus $17.50 for each $1,000 more up to $25,000. Every permit application carries the City's $90 administrative base fee, mechanical permits excepted, and a 4% technology fee (2026 Fee Schedule). Apply through Lakewood's Online Permit Center (app.oncamino.com/lakewood_wa), linked with the account steps from the city's Apply for a Permit page (cityoflakewood.us/permit-center). Computed from Lakewood's adopted fee schedule · source ↗. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your fence in Lakewood — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: what Required submittals above lists.
  3. 3. Submit through the city portal: Lakewood Planning and Public Works Department ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (about $391 for a $6,000 project) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Lakewood Planning and Public Works Department, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Fence permits in Lakewood — FAQ

When does a fence need a permit in Lakewood?

Permit NOT required for: front yard fences ≤4ft (unless along a principal arterial); rear yard fences ≤6ft. Permit required if exceeding these heights, or if located near or within a critical area, critical-area buffer, or Ordinary High-Water Mark.

How much does a fence permit cost in Lakewood?

For a $6,000 fence project, the estimated Lakewood permit fee is about $391.30 (building fee $160 + plan review $120 + surcharges) from Lakewood's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.