Signs permits in City of Lakewood: fees, timeline & requirements (2026)

Everything you need to know about pulling a sign permit in City of Lakewood, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Lakewood Community Development..

Permit required?
Yes — see threshold below
Permit fee
Sign permit fees commonly $100-$400 plus electrical sub-permit.
Review timeline

When does a sign need a permit in City of Lakewood?

City sign code (typically Title 22 or 23) governs. Wall, freestanding, projecting, awning, and electronic message signs all require permits. Most cities exempt small temporary residential signs (real-estate, political) under area thresholds (~6 sqft).

Required submittals

  • site / elevation plan
  • sign drawing with dimensions + materials
  • structural calc if freestanding
  • electrical detail if illuminated

Inspection sequence

  1. footing if freestanding
  2. electrical rough-in if illuminated
  3. final

Contractor specialties needed

general, electrical-01-or-02

Notes & caveats

Issuing body is city building dept (structural review) often with planning sign-off (zoning compliance). Electrical permit required for illuminated signs. Historic-district signs get separate review.

Signs permit fee estimate in City of Lakewood

Worked example for a $25,000 sign project (building permit). Your actual fee scales with project valuation.

Building permit fee$391.25
Plan review$254.31
WA state surcharge$4.5
Estimated total$650.06

Sign permit fees commonly $100-$400 plus electrical sub-permit. Computed from the City of Lakewood fee bracket schedule · source ↗. Impact/utility fees may apply separately.

How to apply

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Lakewood sign — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Lakewood Community Development.
  4. 4. Track review (typical: ). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Sign permit fees commonly $100-$400 plus electrical sub-permit.) and pick up the permit. Inspection card travels with the job.

Signs permits in City of Lakewood — FAQ

When does a sign need a permit in City of Lakewood?

City sign code (typically Title 22 or 23) governs. Wall, freestanding, projecting, awning, and electronic message signs all require permits. Most cities exempt small temporary residential signs (real-estate, political) under area thresholds (~6 sqft).

How much does a sign permit cost in City of Lakewood?

For a $25,000 sign project, the estimated City of Lakewood permit fee is about $650.06 — building fee $391.25 + plan review $254.31 + surcharges. Fees scale with project valuation per the city schedule.

City of Lakewood resourcesPermit portal ↗Fee schedule ↗