Window replacement permits in City of Lakewood: fees, timeline & requirements (2026)

Everything you need to know about pulling a window replacement permit in City of Lakewood, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Lakewood Community Development..

Permit required?
Yes — see threshold below
Permit fee
Like-for-like usually no permit fee. Structural changes scale with valuation.
Review timeline

When does a window replacement need a permit in City of Lakewood?

Permit required for window or door replacement (a "Like for Like" permit type exists per Residential Applications Matrix). Bedrooms have specific egress sizing requirements per IEBC 702.5: where existing window does not meet egress requirements, replacement window must be the manufacturer's largest standard size that fits within existing frame/rough opening.

Required submittals

  • if new/enlarged opening: header schedule, structural detail, WSEC NFRC sticker for U-factor

Inspection sequence

  1. rough-opening inspection (if structural)
  2. final

Contractor specialties needed

general

Notes & caveats

From Lakewood handout B9 (Window/Door Replacement): "Whether or not a building permit is required for installing or replacing a window depends on what kind of structure the windows are going into and what kind of alterations are involved... A floor plan is not required for a window replacement permit. The applicant is required to list the following information during submittal: Room where the window is being replaced (bedroom, kitchen, dining room), size of the window, & U-value for the window... Where windows are being replaced in bedrooms, the customer shall identify that it's an existing bedroom not being converted to be used as a bedroom. Rooms being converted to be used as bedroom shall have emergency escape openings per IEBC 702.5. Where the room is being used as bedroom & the window size does not comply with the requirements, the replacement window is the manufacturer's largest standard size window that will fit within the existing frame or existing rough opening in accordance with IEBC 702.5." Code refs: IBC 2402.1, 1010.1; IEBC 505; IRC R4502.5; WSEC; WAC 51-11R.

Window replacement permit fee estimate in City of Lakewood

Worked example for a $8,000 window replacement project (building permit). Your actual fee scales with project valuation.

Building permit fee$153.25
Plan review$99.61
WA state surcharge$4.5
Estimated total$257.36

Like-for-like usually no permit fee. Structural changes scale with valuation. Computed from the City of Lakewood fee bracket schedule · source ↗. Impact/utility fees may apply separately.

How to apply

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Lakewood window replacement — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (1).
  3. 3. Submit through the city portal: Lakewood Community Development.
  4. 4. Track review (typical: ). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Like-for-like usually no permit fee. Structural changes scale with valuation.) and pick up the permit. Inspection card travels with the job.

Window replacement permits in City of Lakewood — FAQ

When does a window replacement need a permit in City of Lakewood?

Permit required for window or door replacement (a "Like for Like" permit type exists per Residential Applications Matrix). Bedrooms have specific egress sizing requirements per IEBC 702.5: where existing window does not meet egress requirements, replacement window must be the manufacturer's largest standard size that fits within existing frame/rough opening.

How much does a window replacement permit cost in City of Lakewood?

For a $8,000 window replacement project, the estimated City of Lakewood permit fee is about $257.36 — building fee $153.25 + plan review $99.61 + surcharges. Fees scale with project valuation per the city schedule.

City of Lakewood resourcesPermit portal ↗Fee schedule ↗