Land-use permits in Lynnwood: fees, timeline & requirements (2026)

Everything you need to know about pulling a land-use / zoning permit in Lynnwood, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Lynnwood Development & Business Services.

Look up your Lynnwood address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Lynnwood's source.

Permit required?
Always
Permit fee
Lynnwood's variance is $735 for a single-family property and $4,410 otherwise; a conditional use permit is $7,325, and a critical areas permit $790 with no mitigation or $1,815 with a mitigation plan.
Review timeline
Not published by the city

When does land-use or zoning work need a permit in Lynnwood?

Triggered when a project does not conform to the strict letter of the zoning code. Variances require a hardship finding under most city codes. Design review thresholds vary (Seattle: most multifamily + non-residential >4,000 sqft; many cities: design review only in designated districts).

From Lynnwood's own code

“Land uses not specifically listed above may be allowed when determined by the director of development and business services to be compatible with the listed uses and consistent with the intended development of the district. B. Prohibited Uses. 1. Marijuana and marijuana-infused products retail sales, processing or production. 2. Medical marijuana collective gardens. 3. Supervised drug consumption facilities. 4. The following uses are prohibited unless their sites have frontage on and access to 196th Street SW and 64th Avenue W: a.”
Source ↗verified 2026-05-02

Required submittals

  • Narrative of request
  • Site plan
  • Design / elevation drawings if design review
  • SEPA checklist (if required)
  • Mailing labels for public notice

Review steps

  1. Intake completeness
  2. Staff review
  3. Public comment period
  4. Decision (admin or hearing examiner)

Who can do this work in Lynnwood?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Lynnwood and Snohomish County. Kolmo prepares the drawings and submittals, files the land-use / zoning permit with Lynnwood Development & Business Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Lynnwood land-use / zoning quote.

Notes & caveats

Issuing body is city planning, not building. Land-use approvals precede building permits and have their own SEPA threshold review. Process timelines run weeks to months; public notice + hearing examiner involvement is common.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your land-use or zoning work in Lynnwood — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: the 5 documents under Required submittals above.
  3. 3. Submit through the city portal: Lynnwood Development & Business Services ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay the review fees (Lynnwood's fee schedule sets them) and keep the decision with the project.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Lynnwood Development & Business Services, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Land-use permits in Lynnwood — FAQ

When does land-use or zoning work need a permit in Lynnwood?

Triggered when a project does not conform to the strict letter of the zoning code. Variances require a hardship finding under most city codes. Design review thresholds vary (Seattle: most multifamily + non-residential >4,000 sqft; many cities: design review only in designated districts).

How much does a land-use / zoning permit cost in Lynnwood?

Lynnwood's variance is $735 for a single-family property and $4,410 otherwise; a conditional use permit is $7,325, and a critical areas permit $790 with no mitigation or $1,815 with a mitigation plan. A pre-application meeting is $250, credited toward the development review charges, and a zoning verification letter $400 (LMC 3.104.080).