Deck permits in City of Puyallup: fees, timeline & requirements (2026)

Everything you need to know about pulling a deck permit in City of Puyallup, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Puyallup uses Accela ACA..

Permit required?
Yes — see threshold below
Permit fee
Most jurisdictions handle decks as field-inspection or simplified plan review.
Review timeline
· OTC eligible

When does a deck need a permit in City of Puyallup?

Permit required for uncovered decks >30in above grade OR decks serving the exit door required by IRC Section R311.4. Covered porches and patios also require permit (counted as additions).

Required submittals

  • site plan to scale
  • foundation plan
  • framing plan
  • elevations

Inspection sequence

  1. footing
  2. framing
  3. final

Contractor specialties needed

general

Notes & caveats

From Puyallup Building Permit Applications: "Uncovered decks that are more than 30 inches (762 mm) above grade at any point or serve the exit door required by Section R311.4. PMC amendment." Additionally: "Any addition to a single-family residence (covered porches, decks and patios)" requires a building permit.

Deck permit fee estimate in City of Puyallup

Worked example for a $18,000 deck project (building permit). Your actual fee scales with project valuation.

Building permit fee$293.25
Plan review$190.61
WA state surcharge$4.5
Estimated total$488.36

Most jurisdictions handle decks as field-inspection or simplified plan review. Computed from the City of Puyallup fee bracket schedule · source ↗. Impact/utility fees may apply separately.

How to apply

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Puyallup deck — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Puyallup uses Accela ACA.
  4. 4. Track review (typical: ). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Most jurisdictions handle decks as field-inspection or simplified plan review.) and pick up the permit. Inspection card travels with the job.

Deck permits in City of Puyallup — FAQ

When does a deck need a permit in City of Puyallup?

Permit required for uncovered decks >30in above grade OR decks serving the exit door required by IRC Section R311.4. Covered porches and patios also require permit (counted as additions).

How much does a deck permit cost in City of Puyallup?

For a $18,000 deck project, the estimated City of Puyallup permit fee is about $488.36 — building fee $293.25 + plan review $190.61 + surcharges. Fees scale with project valuation per the city schedule.

City of Puyallup resourcesPermit portal ↗Fee schedule ↗