Deck permits in City of Puyallup: fees, timeline & requirements (2026)
Everything you need to know about pulling a deck permit in City of Puyallup, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Puyallup uses Accela ACA..
When does a deck need a permit in City of Puyallup?
Permit required for uncovered decks >30in above grade OR decks serving the exit door required by IRC Section R311.4. Covered porches and patios also require permit (counted as additions).
Required submittals
- site plan to scale
- foundation plan
- framing plan
- elevations
Inspection sequence
- footing
- framing
- final
Contractor specialties needed
general
Notes & caveats
From Puyallup Building Permit Applications: "Uncovered decks that are more than 30 inches (762 mm) above grade at any point or serve the exit door required by Section R311.4. PMC amendment." Additionally: "Any addition to a single-family residence (covered porches, decks and patios)" requires a building permit.
Deck permit fee estimate in City of Puyallup
Worked example for a $18,000 deck project (building permit). Your actual fee scales with project valuation.
| Building permit fee | $293.25 |
| Plan review | $190.61 |
| WA state surcharge | $4.5 |
| Estimated total | $488.36 |
Most jurisdictions handle decks as field-inspection or simplified plan review. Computed from the City of Puyallup fee bracket schedule · source ↗. Impact/utility fees may apply separately.
How to apply
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Puyallup deck — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
- 2. Assemble submittals (4).
- 3. Submit through the city portal: Puyallup uses Accela ACA. ↗
- 4. Track review (typical: —). Respond to reviewer comments promptly.
- 5. Pay issuance fees (Most jurisdictions handle decks as field-inspection or simplified plan review.) and pick up the permit. Inspection card travels with the job.
Deck permits in City of Puyallup — FAQ
When does a deck need a permit in City of Puyallup?
Permit required for uncovered decks >30in above grade OR decks serving the exit door required by IRC Section R311.4. Covered porches and patios also require permit (counted as additions).
How much does a deck permit cost in City of Puyallup?
For a $18,000 deck project, the estimated City of Puyallup permit fee is about $488.36 — building fee $293.25 + plan review $190.61 + surcharges. Fees scale with project valuation per the city schedule.
