Solar permits in City of Puyallup: fees, timeline & requirements (2026)

Everything you need to know about pulling a rooftop solar / PV permit in City of Puyallup, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Puyallup Development & Permitting Services.

Look up your City of Puyallup address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Puyallup's source.

City of Puyallup: we don't yet have an authoritative rooftop solar / PV rule on file for this city. Until we verify, fall back to Washington-state baseline code (IRC/IBC/WSEC) and the county building department. Call Puyallup Development & Permitting Services for project-specific guidance.

Who can do this work in City of Puyallup?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Puyallup and Pierce County. Kolmo prepares the drawings and submittals, files the rooftop solar / PV permit with Puyallup Development & Permitting Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Puyallup rooftop solar / PV quote.

Solar permit fee estimate in City of Puyallup

Worked example for a $25,000 rooftop solar / PV project (building permit). Your actual fee scales with project valuation.

Building permit fee$391.25
Plan review$254.31
WA state surcharge$6.50
Estimated total$652.06

$2,001 - 25,000: $69.25 for the first 2,000 plus $14 for each additional $1,000 or fraction thereof, to and including $25,000 (Puyallup 2026 Municipal Fee Schedule, Building Permit Fees, page 28). Computed from City of Puyallup's adopted fee schedule · source ↗. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Puyallup rooftop solar / PV — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (site plan, scope-of-work, photos).
  3. 3. Submit through the city portal: Puyallup Development & Permitting Services ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (see fee schedule) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull rooftop solar / PV permits in City of Puyallup every month. We prepare the drawings and submittals, file with Puyallup Development & Permitting Services, handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Solar permits in City of Puyallup — FAQ

How much does a rooftop solar / PV permit cost in City of Puyallup?

For a $25,000 rooftop solar / PV project, the estimated City of Puyallup permit fee is about $652.06 (building fee $391.25 + plan review $254.31 + surcharges) from City of Puyallup's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

City of Puyallup resourcesPermit portal ↗Fee schedule ↗