Addition permits in City of Sammamish: fees, timeline & requirements (2026)

Everything you need to know about pulling a home addition permit in City of Sammamish, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Apply via MyBuildingPermit.com..

Permit required?
Yes — see threshold below
Permit fee
Plan-review fee scales with valuation per UBC Table 1-A. State surcharge $4.50 per building permit. Trade permits (E/P/M) separate. Apply via https://mybuildingpermit.com.
Review timeline
30–120 days

When does a home addition need a permit in City of Sammamish?

Single-family/duplex additions require a building permit (MBP: Building → Single-Family Residential → Structure Addition). Demolitions, pools, retaining walls, and detached structures require separate permits. A Sewer Availability Certificate is required when the project exceeds 50% of the assessed value or adds plumbing fixtures.

From City of Sammamish's own page

Please note that demolitions, pools, retaining walls, and detached structures require submittal of a separate demolition or building permit.
Source ↗verified 2026-06-26

Required submittals

  • Acceptance of Financial Responsibility (Affidavit of Applicant Status)
  • Historic Resources Affidavit
  • Legal Description
  • Plan Set (existing + proposed)
  • Project Narrative
  • Residential Fixture Count Form
  • Sewer Availability Certificate (when >50% assessed value or fixtures added)

Inspection sequence

  1. foundation/footing
  2. plumbing rough-in
  3. electrical rough-in
  4. mechanical rough-in
  5. framing
  6. insulation
  7. drywall
  8. final

Contractor specialties needed

general, electrical-01-or-02, plumbing, mechanical

Notes & caveats

2021 IRC R301 governs framing. WSEC R402.1 sets envelope requirements. New conditioned space requires Manual J HVAC sizing. Lateral load path continuity required for vertical additions. Most WA cities use a uniform fee bracket (UBC Table 1-A) for the building permit; plan review fee is typically 65% of building permit fee.

Addition permit fee estimate in City of Sammamish

Worked example for a $120,000 home addition project (building permit). Your actual fee scales with project valuation.

Building permit fee$1,105.75
Plan review$718.74
WA state surcharge$4.5
Estimated total$1,828.99

Plan-review fee scales with valuation per UBC Table 1-A. State surcharge $4.50 per building permit. Trade permits (E/P/M) separate. Apply via https://mybuildingpermit.com. Computed from the City of Sammamish fee bracket schedule · source ↗. Impact/utility fees may apply separately.

How to apply

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Sammamish home addition — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (7).
  3. 3. Submit through the city portal: Apply via MyBuildingPermit.com.
  4. 4. Track review (typical: 30–120 days). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Plan-review fee scales with valuation per UBC Table 1-A. State surcharge $4.50 per building permit. Trade permits (E/P/M) separate. Apply via https://mybuildingpermit.com.) and pick up the permit. Inspection card travels with the job.

Addition permits in City of Sammamish — FAQ

When does a home addition need a permit in City of Sammamish?

Single-family/duplex additions require a building permit (MBP: Building → Single-Family Residential → Structure Addition). Demolitions, pools, retaining walls, and detached structures require separate permits. A Sewer Availability Certificate is required when the project exceeds 50% of the assessed value or adds plumbing fixtures.

How much does a home addition permit cost in City of Sammamish?

For a $120,000 home addition project, the estimated City of Sammamish permit fee is about $1,828.99 — building fee $1,105.75 + plan review $718.74 + surcharges. Fees scale with project valuation per the city schedule.

How long does City of Sammamish take to review a home addition permit?

Typical review window: 30–120 days.

City of Sammamish resourcesPermit portal ↗Fee schedule ↗