Basement finish permits in City of Sammamish: fees, timeline & requirements (2026)

Everything you need to know about pulling a basement finish permit in City of Sammamish, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Apply via MyBuildingPermit.com..

Look up your City of Sammamish address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Sammamish's source.

Permit required?
Always
Permit fee
Plan-review fee scales with valuation. State surcharge $6.50. Apply via https://mybuildingpermit.com.
Review timeline
Not published by the city

When does a basement finish need a permit in City of Sammamish?

2021 IRC R310: every sleeping room below grade requires emergency escape and rescue opening (egress window). Min sill height 44in, min net clear opening 5.7 sq ft (5.0 grade-floor), min width 20in, height 24in. Ceiling height min 7ft (R305). Entire newly conditioned area must comply with WSEC R402.

How City of Sammamish adopted this rule

The threshold comes from the state code (WAC 51.51), which City of Sammamish adopts by reference in the provision quoted below.

“The 2021 Edition of the International Building Code, as adopted by the State Building Code Council in Chapter 51-50 WAC, as published by the International Code Council, including Appendix Chapter E (Accessibility), ICC A117.1-2017 (Accessible Standards), and Appendix Chapter H (Signs), excluding Chapter 1, Administration, is hereby adopted by the City of Sammamish, together with the following amendments and additions: Exceptions.”
Source ↗verified 2026-05-29

Required submittals

  • floor plan w/ egress windows + ceiling heights
  • electrical layout
  • plumbing diagram
  • mechanical / HVAC plan
  • WSEC compliance form (newly conditioned space)
  • smoke/CO alarm locations

Inspection sequence

  1. rough-in (electrical/plumbing/mechanical)
  2. framing
  3. insulation
  4. drywall
  5. final

Contractor specialties needed

general, electrical-01-or-02, plumbing, mechanical

Who can do this work in City of Sammamish?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Sammamish and King County. Kolmo prepares the drawings and submittals, files the basement finish permit with Apply via MyBuildingPermit.com., carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Sammamish basement finish quote.

Notes & caveats

Construction permit required for any habitable space addition. Smoke + CO alarms required (R314, R315). Any new circuits, plumbing fixtures, or HVAC requires trade permits.

Basement finish permit fee — Washington baseline, not City of Sammamish's own schedule

Worked example for a $40,000 basement finish project (building permit). Your actual fee scales with project valuation.

Building permit fee$542.75
Plan review$352.79
WA state surcharge$6.5
Estimated total$902.04

Plan-review fee scales with valuation. State surcharge $6.50. Apply via https://mybuildingpermit.com. We have not read City of Sammamish's adopted fee schedule, so this is not City of Sammamish's fee: it walks the standard valuation table most Washington cities adopt by reference, as a rough guide. The real numbers are in City of Sammamish's fee schedule ↗. Impact/utility fees may apply separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Sammamish basement finish — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (6).
  3. 3. Submit through the city portal: Apply via MyBuildingPermit.com. ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Plan-review fee scales with valuation. State surcharge $6.50. Apply via https://mybuildingpermit.com.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull basement finish permits in City of Sammamish every month. We prepare the drawings and submittals, file with Apply via MyBuildingPermit.com., handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Basement finish permits in City of Sammamish — FAQ

When does a basement finish need a permit in City of Sammamish?

2021 IRC R310: every sleeping room below grade requires emergency escape and rescue opening (egress window). Min sill height 44in, min net clear opening 5.7 sq ft (5.0 grade-floor), min width 20in, height 24in. Ceiling height min 7ft (R305). Entire newly conditioned area must comply with WSEC R402.

How much does a basement finish permit cost in City of Sammamish?

For a $40,000 basement finish project, the estimated City of Sammamish permit fee is about $902.04 — building fee $542.75 + plan review $352.79 + surcharges. Fees scale with project valuation per the city schedule.

City of Sammamish resourcesPermit portal ↗Fee schedule ↗