Heat pump permits in City of Seattle: fees, timeline & requirements (2026)

Everything you need to know about pulling a heat pump / ductless mini-split permit in City of Seattle, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Seattle Department of Construction & Inspections (SDCI).

Look up your City of Seattle address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Seattle's source.

City of Seattle: we don't yet have an authoritative heat pump / ductless mini-split rule on file for this city. Until we verify, fall back to Washington-state baseline code (IRC/IBC/WSEC) and the county building department. Call Seattle Department of Construction & Inspections (SDCI) for project-specific guidance.

Who can do this work in City of Seattle?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Seattle and King County. Kolmo prepares the drawings and submittals, files the heat pump / ductless mini-split permit with Seattle Department of Construction & Inspections (SDCI), carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Seattle heat pump / ductless mini-split quote.

Heat pump permit fee estimate in City of Seattle

Worked example for a $16,000 heat pump / ductless mini-split project (building permit). Your actual fee scales with project valuation.

Building permit fee$565
Plan review$565
Technology surcharge$56.50
WA state surcharge$6.50
Estimated total$1,193

SMC 22.900D.010 Table D-1 (2026 Fee Subtitle, eff. 2026-01-01): $1,001 to $25,000: $325 for the first $1,000 plus $1.60 per additional $100 or fraction. This is the Development Fee Index; the permit fee is 100% of it and plan review is 100% (full review) or 40% (STFI) — see ANCILLARY_FEES + fee-calculator. Computed from City of Seattle's adopted fee schedule · source ↗. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Seattle heat pump / ductless mini-split — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (site plan, scope-of-work, photos).
  3. 3. Submit through the city portal: Seattle Department of Construction & Inspections (SDCI) ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (see fee schedule) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull heat pump / ductless mini-split permits in City of Seattle every month. We prepare the drawings and submittals, file with Seattle Department of Construction & Inspections (SDCI), handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Heat pump permits in City of Seattle — FAQ

How much does a heat pump / ductless mini-split permit cost in City of Seattle?

For a $16,000 heat pump / ductless mini-split project, the estimated City of Seattle permit fee is about $1,193 (building fee $565 + plan review $565 + surcharges) from City of Seattle's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

City of Seattle resourcesPermit portal ↗Fee schedule ↗