Kitchen remodel permits in City of Seattle: fees, timeline & requirements (2026)

Everything you need to know about pulling a kitchen remodel permit in City of Seattle, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Seattle Department of Construction & Inspections (SDCI).

Permit required?
Yes — see threshold below
Permit fee
Subject-to-Field-Inspection if no structural change. See 2026 SDCI Fee Subtitle.
Review timeline

When does a kitchen remodel need a permit in City of Seattle?

Cosmetic-only refresh exempt. Most full kitchen remodels touch electrical (new circuits for dishwasher/disposal/microwave) and plumbing (sink/dishwasher), so plan on Construction Permit (Subject-to-Field-Inspection if no structural change) plus electrical, plumbing, mechanical permits.

Required submittals

  • floor plan w/ fixture locations
  • electrical layout
  • plumbing diagram
  • WSEC compliance form if envelope/lighting affected

Inspection sequence

  1. rough-in (electrical/plumbing/mechanical)
  2. insulation if walls opened
  3. drywall
  4. final

Contractor specialties needed

general, electrical-01-or-02, plumbing

Notes & caveats

SDCI typically allows kitchens as Subject-to-Field-Inspection unless structural changes. GFCI/AFCI per WA-adopted NEC. WSEC applies if envelope/lighting modified.

How to apply

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup on the main permits page — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Seattle Department of Construction & Inspections (SDCI)
  4. 4. Track review (typical: ). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Subject-to-Field-Inspection if no structural change. See 2026 SDCI Fee Subtitle.) and pick up the permit. Inspection card travels with the job.
City of Seattle resourcesPermit portal ↗Fee schedule ↗