Kitchen remodel permit requirements across 17 Seattle-area cities
Side-by-side: which of Seattle, Bellevue, Kirkland, Redmond, Sammamish, Issaquah, Renton, Kent, Federal Way, Mercer Island, Shoreline, Tacoma, Lakewood, Puyallup, Everett, Lynnwood, Woodinville require a permit for a kitchen remodel, and what triggers one — each row quoted from the city's own code or permit page, with the source linked. Fees and review times appear where the city publishes them.
14 of 17 cities have authoritative rules on file · 0 always require a permit · 17 depend on the scope · 0 do not.
King County
| Jurisdiction | Threshold | Fee | Review days | Source |
|---|---|---|---|---|
Depends on scope | Finish work (cabinets, counters, tile, paint) needs no permit; moving plumbing, new circuits, gas or venting, or any wall or structural change does. Replacing kitchen cabinets or countertops does not require a permit; new circuits, moved plumbing, gas lines, or wall changes do. | Fee: Bellevue prices a kitchen remodel's building permit on the value of the work: $44 up to $500, $44 plus $6.39 for each $100 more up to $2,000, $139.85 for the first $2,000 plus $25.60 for each $1,000 more up to $25,000, and $728.65 for the first $25,000 plus $19.06 for each $1,000 more up to $50,000, each prorated. Plan review is 65% of that fee and the operations fee $53 (Ordinance 6879), and the state building code fee is $6.50 on a residential permit (RCW 19.27.085). Where the remodel needs land use review, that is $304. Bellevue, not L&I, issues the electrical permit, priced on the value of the electrical work: $79 up to $500, $79 plus $11.82 for each $100 more up to $2,000, and $256.30 for the first $2,000 plus $34.86 for each $1,000 more up to $25,000. Plumbing is $50 for the first fixture and $17.34 for each one more; mechanical is $59 for each furnace, heat pump, air conditioner or gas appliance and $34 for each fan. Each trade permit carries a $21 operations fee over the counter, or $53 and a $145 plan review fee when its scope needs building review. Apply via mybuildingpermit.com. | Review: 10–21 days | Cite verified 2026-05-29 |
Depends on scope | Finish work (cabinets, counters, tile, paint) needs no permit, except in a critical area or flood hazard area, where every job needs one. Replacing a sink or faucet, even in the same spot, moving plumbing, new circuits, gas or venting, or a wall or structural change always does. Cosmetic finish work (cabinets, countertops, tile) is exempt; remodels touching framing, wiring, plumbing, or mechanical require a permit per the Single Family Remodel Checklist (#156). | Fee: Federal Way prices a kitchen remodel's building permit on the value of the work (the ICC's building valuation data, or a bid the Building Official approves), off Valuation Table A: $89.54 up to $1,000, $157.11 for the first $2,000 plus $33.68 for each $1,000 more up to $25,000, and $931.63 for the first $25,000 plus $24.00 for each $1,000 more up to $50,000; plan review is 65% of the building permit fee. Plumbing and mechanical work is priced on the same table by its installation value, and the City's own electrical permit on Valuation Table B, $96.21 up to $1,000 of installation value; plan review, where plans are reviewed, is 65% of each permit fee. Each permit carries the automation fee, the greater of $43 or 5% of the permit fee, and a residential building permit the $6.50 state building code fee (2026 Fee Schedule). | Review: — | Cite verified 2026-05-29 |
Depends on scope | Finish work (cabinets, counters, tile, paint) and a same-spot sink swap that replaces no valves or pipes need no permit, unless an existing accessible feature is altered. Moving plumbing, replacing a faucet or other valve, new circuits, gas or venting, or any wall or structural change needs one. A Single-Family Interior Remodel permit is required for all interior remodels. Sink/toilet replacement without plumbing-line modification is exempt; cabinets/countertops/tiling are exempt finish work; any plumbing/mechanical fixture alteration or structural change triggers the permit. | Fee: Issaquah prices a kitchen remodel's building permit on the value of the work: $32.39 up to $500, $32.39 plus $4.05 for each $100 more up to $2,000, $96.55 for the first $2,000 plus $19.60 for each $1,000 more up to $25,000, and $544.06 for the first $25,000 plus $14.23 for each $1,000 more up to $50,000. Plan review adds 65% of that fee, a 6% technology surcharge is added to both, and the state building code fee is $6.50. Plumbing is $31.44 for each new or moved fixture and mechanical $62.88 for each new appliance or duct system, each $62.88 at the least and $422.04 at the most, with a separate technology fee. Electrical permits come from L&I, not the City, at L&I's fees. Apply via mybuildingpermit.com. | Review: — | Cite verified 2026-05-29 |
Depends on scope | Under the state code cabinets, counters, paint and tile need no permit. Replacing a sink or faucet, even in the same spot, or moving or adding plumbing needs a plumbing permit: the state plumbing code exempts only clearing a stoppage or fixing a leak with nothing replaced. Gas or venting work, new circuits and moving a wall need permits too. Cosmetic finish work (cabinets, countertops, tile, paint) is exempt; altering structure or moving electrical/gas/mechanical/plumbing triggers a Residential Alteration permit. Electrical permits route to WA L&I. | Fee: Kent prices a kitchen remodel's building permit on the value of the work: $52.82 up to $500, $52.82 for the first $500 plus $6.88 for each $100 more up to $2,000, and $155.95 for the first $2,000 plus $31.55 for each $1,000 more up to $25,000, then $881.32 for the first $25,000 plus $22.75 for each $1,000 more up to $50,000. Intake fees are billed once the submittal is complete, and the rest before the permit issues. The plumbing and mechanical permits are priced separately, and the City's posted fee documents (its 2026 building permit fee table and land use fees) list neither, so the Permit Center (253-856-5300) quotes them. Electrical permits come from L&I, at L&I's fees. Apply through the City of Kent Permit Portal (sso.kentwa.gov). | Review: — | Cite verified 2026-05-29 |
Depends on scope | No permit for cabinets, counters, paint or tile, or a same-spot sink swap that replaces no valves or pipes, unless existing accessible features are altered or the lot is in a flood hazard area, a critical area or its buffer, or a wildland-urban interface (WUI) location. A permit once you move plumbing, replace a faucet or other valve, add circuits, run gas or change walls. Cabinet/countertop/finish swaps are exempt. Like-for-like fixture replacement without plumbing-line modification (sinks, toilets) needs no permit; moving plumbing lines, adding circuits, or structural/layout changes trigger a permit. Electrical is permitted separately by the City of Kirkland (KMC 21.06.210). KMC 21.06.215(1)(I) exempts "Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work; provided, that existing accessibility features are not altered." None of this is exempt in a flood hazard area, a critical area or its buffer, or where the International Wildland-Urban Interface Code applies. KMC 21.06.215: "Permit exemptions shall not apply to areas of flood hazard or city land use critical areas and their required buffers, or locations subject to the construction requirements of the International Wildland-Urban Interface Code." | Fee: Kirkland prices a kitchen remodel's building permit on the value of the work: $113 for the first $2,000 plus $23.62 for each $1,000 more up to $25,000, and $639 for the first $25,000 plus $17.46 for each $1,000 more up to $50,000, then $1,048 for the first $50,000 plus $10.27 for each $1,000 more up to $100,000. Plan review is 65% of that fee, plus the $6.50 state building code fee. For the remodel, plumbing is $30 for each new or moved fixture ($60 at the least, $358 at the most), mechanical $121 for each appliance, new duct system or gas piping ($364 at the most), and the City, not L&I, issues the electrical permit, priced on the value of the electrical work: $83 up to $250, $83 plus $12 for each $100 more up to $2,000, and $331 for the first $2,000 plus $30 for each $1,000 more up to $25,000. A 3.5% technology fee is added to the City's permit and plan review fees (Kirkland Building Services Fees, 2026). Apply via mybuildingpermit.com. | Review: — | Cite verified 2026-05-29 |
Depends on scope | Finish work (cabinets, counters, tile, paint) needs no permit unless it alters an existing required accessible feature or the building is a multiunit residential building under RCW 64.55. Moving plumbing, replacing a faucet or other valve, new circuits, gas or venting, or any wall or structural change needs a permit. Cosmetic-only refresh (cabinets, countertops, flooring, paint) without structural/electrical/plumbing changes is generally exempt under 2021 IRC R105.2 (work exempt from permit). Any new circuit, fixture relocation, or structural change requires permits. | Fee: Mercer Island prices a kitchen remodel's building permit on the value of the work: $40.06 up to $500, $118.83 for the first $2,000 plus $23.24 for each $1,000 more up to $25,000, and $671.95 for the first $25,000 plus $16.87 for each $1,000 more up to $50,000. Plan check adds 70% of that fee. Mechanical, electrical and plumbing inspection on the same permit is a combination fee of 31% of the building permit fee (10%, 11% and 10% if permitted separately). The state energy compliance review for a residential alteration is $261 (2026 Fee Schedule). | Review: — | Cite verified 2026-04-29 |
Depends on scope | Finish work (cabinets, counters, tile, paint) needs no permit. Replacing a sink or faucet needs a plumbing permit, and moving plumbing, new circuits, gas or venting, or any wall change needs a permit too. Cosmetic-only refresh (cabinets, countertops, flooring, paint) without structural/electrical/plumbing changes is generally exempt under 2021 IRC R105.2 (work exempt from permit). Any new circuit, fixture relocation, or structural change requires permits. | Fee: Redmond prices a kitchen remodel's building permit on the value of the work: $46.89 up to $500, $46.89 for the first $500 plus $6.08 for each $100 more up to $2,000, $138.26 for the first $2,000 plus $27.90 for each $1,000 more up to $25,000, and $781.12 for the first $25,000 plus $20.17 for each $1,000 more up to $50,000. Plan review is 65% of that fee, and the schedule's fire fee for a residential remodel, where Fire review applies, is $796.48. Plumbing is a separate City permit, $140.71 plus $48.55 for each sink, dishwasher or disposal; mechanical is $140.71 plus $48.25 for the range exhaust. The City, not L&I, issues the electrical permit: $140.71 plus $96.02 for 0 to 3 new or altered circuits, or $192.03 for more. A 4% technology surcharge applies to the total, plus the $6.50 state building code fee (2026 fee schedules). Apply through the Redmond ePermitting Service, REPS (cityofredmondwa-energovweb.tylerhost.net/ | Review: — | Cite verified 2026-10-02 |
Depends on scope | Finish work (cabinets, counters, tile, paint) needs no permit, except in a flood hazard area or a critical area, in a condominium or other multiunit residential building, or when it changes required accessible features. Replacing a faucet, moving plumbing, new circuits, gas or venting work, or any wall or structural change needs a permit. Cosmetic-only refresh (cabinets, countertops, flooring, paint) without structural/electrical/plumbing changes is generally exempt under 2021 IRC R105.2 (work exempt from permit). Any new circuit, fixture relocation, or structural change requires permits. | Fee: Renton prices a kitchen remodel's building permit on the value of the work: $44 up to $500, $119.66 for the first $2,000 plus $22.99 for each $1,000 more up to $25,000, and $648.47 for the first $25,000 plus $16.55 for each $1,000 more up to $50,000. Plan check is 65% of the permit fee, three review cycles included, and the $6.50 state building code fee applies. A residential plumbing permit is a $69 base fee plus $12 a fixture, a mechanical permit $69 plus $28 for each appliance, fan or gas piping system, and the City's electrical permit for new circuits without a service change $222 at the least; plan review on those permits, where required, is 40% of the permit fee. The City adds its 5% technology surcharge to each of these fees (Fee Schedule 2025-2026). Apply via permitting.rentonwa.gov. | Review: — | Cite verified 2026-05-17 |
Depends on scope | Finish work (cabinets, counters, tile, paint) needs no permit as long as it does not alter an existing accessible feature; replacing a faucet, moving plumbing, new circuits, gas or venting, a wall or structural change, or altering an accessible feature does. Finish work (cabinets, countertops, tile, paint) is exempt; moving walls or adding/relocating plumbing/electrical triggers a Single-Family Residential Remodel permit. A Sewer Availability Certificate is required when the project exceeds 50% of the assessed value or adds plumbing fixtures. | Fee: Sammamish prices a kitchen remodel's building permit on the value of the work: $142.05 up to $500, $236.77 for the first $2,000 plus $20.59 for each $1,000 more up to $25,000, and $710.28 for the first $25,000 plus $11.37 for each $1,000 more up to $50,000, with plan review at 65% of the permit fee. Planning's review of a remodel's building application is a $753 flat fee, and the energy code review $91. A residential combination plumbing or mechanical permit is $134 for up to 3 items and $45 for each more, and the City's electrical permit is priced on the value of the electrical work, $92.33 up to $250 and $215.45 for the first $2,000 plus $18.73 for each $1,000 more up to $25,000. The City adds a 15% technology fee to each fee (2026 Fee Schedule). Apply via mybuildingpermit.com. | Review: — | Cite verified 2026-05-29 |
Depends on scope | No permit for cabinets, counters, paint or tile. A permit once you replace a sink or faucet (plumbing, from Public Health), add circuits (SDCI electrical), run gas or change walls, and an SDCI construction permit for any remodel beyond cabinets and finishes once the work on the house is worth more than $6,000 in six months. In a special flood hazard area, or on a parcel with an environmentally critical area, even the exempt work needs floodplain development approval or the Director's approval of an exemption. Cosmetic-only refresh exempt. Most full kitchen remodels touch electrical (new circuits for dishwasher/disposal/microwave) and plumbing (sink/dishwasher), so plan on Construction Permit (Subject-to-Field-Inspection if no structural change) plus electrical, plumbing, mechanical permits. | Fee: Where a kitchen remodel needs an SDCI permit, it is usually a subject-to-field-inspection permit unless the structure changes. SDCI prices the building permit on the value of the work through its Development Fee Index: $325 for the first $1,000, plus $1.60 for each $100 more to $25,000 ($709 there), $1.55 per $100 to $50,000 ($1,096.50), $1.50 per $100 to $75,000 ($1,471.50) and $1.40 per $100 to $100,000. A subject-to-field-inspection permit, SDCI's simpler path with no full plan review, is 100% of the index plus a plan review fee of 40% (minimum $116.75), and the permit fee is due at application. A 5% technology fee is added to every SDCI fee, and the state building code fee is $6.50 on a residential permit (SMC 22.900; RCW 19.27.085). A $40,000 remodel comes to about $1,390. SDCI, not L&I, issues the electrical permit: $26.28 for each new or altered branch circuit up to 25 amps and $43.80 for 30 to 50 amps, plus a $55.48 administrative fee, minimum $105.12. Plumbing and gas piping permits come from Public Health – Seattle & King County, which sets and collects their fees. | Review: — | Cite verified 2026-04-26 |
Depends on scope | Under the state code cabinets, counters, paint and tile need no permit. Replacing a sink or faucet, even in the same spot, or moving or adding plumbing needs a plumbing permit: the state plumbing code exempts only clearing a stoppage or fixing a leak with nothing replaced. Gas or venting work, new circuits and moving a wall need permits too. Simple interior remodel work (replacing cabinets, painting, tiling) does not need a permit unless it involves plumbing, electrical, or gas-line work, or moves walls. | Fee: Shoreline prices a kitchen remodel's building permit on the value of the work, as supplied by the applicant or contractor: $267 up to $16,000, $75 for the first $2,000 plus $14 for each $1,000 more up to $25,000, and $397 for the first $25,000 plus $11 for each $1,000 more up to $50,000, then $672 for the first $50,000 plus $9 for each $1,000 more up to $100,000. Plan review is 65% of that fee, plus the $6.50 state building code fee. Plumbing and mechanical permits are each $267 including 4 fixtures or pieces of equipment, and $12 for each one more. Electrical permits come from L&I, at L&I's fees. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/ | Review: — | Cite verified 2026-05-17 |
Depends on scope | Finish work (cabinets, counters, tile, paint) needs no permit; replacing a sink or faucet, even in the same spot, moving plumbing, new circuits, gas or venting, or any wall or structural change does. Cabinets, countertops, painting, tile and similar finish work need no building permit in Woodinville when no inspection is needed to verify code compliance (WMC 21.62.070 item 6). Moving or adding plumbing, replacing a sink or faucet, gas or venting work, and moving a wall or other structural work need permits; with a building permit, the plumbing and mechanical work is part of the City's Combined Building Permit. New or moved circuits need an electrical permit from L&I: the City issues none. | Fee: Woodinville prices a kitchen remodel's building permit on the applicant's estimate of its full value, labor and materials included, off the City's 2026 building permit fee table (WMC 21.62.060(2)), plus plan review at 65% of that fee and the $6.50 state surcharge. Plumbing and mechanical work on the Combined Building Permit adds $25 a fixture. A sink, faucet or appliance replaced on its own is a plumbing or mechanical permit, $119 plus $25 a fixture. Electrical permits come from L&I, at L&I's fees. Apply through Woodinville's online Permit Portal (aca-prod.accela.com/ | Review: — | Cite verified 2026-11-07 |
Pierce County
| Jurisdiction | Threshold | Fee | Review days | Source |
|---|---|---|---|---|
Depends on scope | No permit for cabinets, counters, paint or tile. A permit once you replace a sink or faucet, even in the same spot, move plumbing, add circuits, run gas or change walls. Cosmetic-only refresh (cabinets, countertops, flooring, paint) without structural/electrical/plumbing changes is generally exempt under 2021 IRC R105.2 (work exempt from permit). Any new circuit, fixture relocation, or structural change requires permits. | Fee: Lakewood prices a kitchen remodel's building permit on the value of the work, set by the Building Official: $30 up to $500, $90 for the first $2,000 plus $17.50 for each $1,000 more up to $25,000, and $492.50 for the first $25,000 plus $12.50 for each $1,000 more up to $50,000. Plan review is 65% of the building permit fee, one hour at the least, and the $6.50 state building code fee applies. Plumbing and mechanical work is priced on the City's unit tables, a $34 issuance fee plus, for example, $12 a plumbing fixture or $18 a fan, with plan review at 25% where plans are required. The electrical permit comes from Tacoma Power or L&I, at their fees. Every permit application carries the City's $90 administrative base fee, mechanical permits excepted, and a 4% technology fee (2026 Fee Schedule). Apply through Lakewood's Online Permit Center (app.oncamino.com/ | Review: — | Cite verified 2026-04-29 |
Depends on scope | Under the state code cabinets, counters, paint and tile need no permit. Replacing a sink or faucet, even in the same spot, or moving or adding plumbing needs a plumbing permit: the state plumbing code exempts only clearing a stoppage or fixing a leak with nothing replaced. Gas or venting work, new circuits and moving a wall need permits too. Cosmetic-only refresh (cabinets, countertops, flooring, paint) without structural/electrical/plumbing changes is generally exempt under 2021 IRC R105.2 (work exempt from permit). Any new circuit, fixture relocation, or structural change requires permits. | Fee: Puyallup prices a kitchen remodel's building permit on the value of the work: $25 up to $500, $25 for the first $500 plus $3.05 for each $100 more up to $2,000, $69.25 for the first $2,000 plus $14 for each $1,000 more up to $25,000, and $391.25 for the first $25,000 plus $10.10 for each $1,000 more up to $50,000, with plan review added as set in the schedule's Exhibit A. Plumbing is a separate City permit, $40 to issue plus $13 for each fixture altered, with plan review at 65% of the plumbing fee; mechanical work is $40 to issue plus unit fees, such as $14.10 for a ventilation system. The electrical permit comes from L&I, at L&I's fees (2026 Municipal Fee Schedule). Apply through Puyallup's online permit system, CityView (permits.puyallupwa.gov/ | Review: — | Cite verified 2026-04-29 |
Depends on scope | In Tacoma cabinets, counters, paint and tile need no permit. Replacing a sink or faucet, even in the same spot, or moving or adding plumbing needs a plumbing permit: the plumbing code exempts only clearing a stoppage or fixing a leak with nothing replaced. Gas or venting work needs a mechanical permit, new circuits an electrical permit from Tacoma Power, and moving a wall a building permit. Cabinets, countertops, painting, tiling, carpeting and similar finish work are exempt. New circuits, fixture relocation, or plumbing modifications require respective trade permits. | Fee: Tacoma prices a single-family or duplex remodel as one combination building, mechanical and plumbing permit (PDS Fee Schedule Table 8-4): 2.81% of valuation, minimum $180, plus plan review at 45% of that fee. Table 1 adds the Technology Program (5%), Natural Resources Program (5%) and Reserve Fund (2%) on permit and plan review fees and Emergency Preparedness (5%) on permit fees; the state building code fee is $6.50. Electrical permits are separate, issued by Tacoma Power (TMC 12.06A). | Review: 10–21 days | Cite verified 2026-04-29 |
Snohomish County
| Jurisdiction | Threshold | Fee | Review days | Source |
|---|---|---|---|---|
Depends on scope | Under the state code cabinets, counters, paint and tile need no permit. Replacing a sink or faucet, even in the same spot, or moving or adding plumbing needs a plumbing permit: the state plumbing code exempts only clearing a stoppage or fixing a leak with nothing replaced. Gas or venting work, new circuits and moving a wall need permits too. Cosmetic-only refresh (cabinets, countertops, flooring, paint) without structural/electrical/plumbing changes is generally exempt under 2021 IRC R105.2 (work exempt from permit). Any new circuit, fixture relocation, or structural change requires permits. | Fee: Where a kitchen remodel needs a permit in Everett, the building permit is priced on the value of the work: $150 for work valued up to $2,000, $295.50 plus $22.75 for each $1,000 over $2,000 up to $25,000, and $818.75 plus $21.75 for each $1,000 over $25,000 up to $50,000. Plan review adds 75% of that fee and Planning's review 10%, plus the $6.50 state building code fee. The plumbing permit is a $130 base fee plus $20 for each fixture, the mechanical permit is the $130 base fee plus, priced on the contract, $20 for work of $500 or less, $35 up to $1,000, or $50 above $1,000 and $20 more for each $5,000 over the first $1,000. Everett, not L&I, issues the electrical permit: for a remodel or addition it is priced on the size of the project, $100 under 1,000 square feet and $150 from 1,001 to 2,000, or $75 for 1 or 2 circuits added or altered without a service change and $100 for 3 or more. | Review: 10–21 days | Cite verified 2026-10-02 |
Depends on scope | Under the state code cabinets, counters, paint and tile need no permit. Replacing a sink or faucet, even in the same spot, or moving or adding plumbing needs a plumbing permit: the state plumbing code exempts only clearing a stoppage or fixing a leak with nothing replaced. Gas or venting work, new circuits and moving a wall need permits too. Cosmetic-only refresh (cabinets, countertops, flooring, paint) without structural/electrical/plumbing changes is generally exempt under 2021 IRC R105.2 (work exempt from permit). Any new circuit, fixture relocation, or structural change requires permits. | Fee: Lynnwood prices a kitchen remodel's building permit on the value of the work, by the ICC valuation table or the building's square footage, whichever is greater: $114 up to $1,000, $114 for the first $1,000 plus $5.74 for each $100 more up to $2,000, $171.35 for the first $2,000 plus $25.23 for each $1,000 more up to $25,000, and $751.73 for the first $25,000 plus $17.21 for each $1,000 more up to $50,000. Plan review is 65% of that fee. Plumbing and mechanical permits for a remodel are each $257 for up to 4 fixtures or pieces of equipment and $22 for each one more, and the City, not L&I, issues the electrical permit: $147 for up to 10 circuits added or altered, $15 for each more circuit up to a $200 total. A 2.5% technology fee is added (LMC 3.104). | Review: — | Cite verified 2026-10-02 |
How this table is built
Each row reflects the most-recently-verified authoritative rule on file for that jurisdiction and project type. A row shows a fee where the city publishes one; every building permit in Washington also carries the State Building Code Council's $6.50 surcharge. Sources link directly to the city or county page we read on the verified-on date. See our data-quality leaderboard for how we keep these current.