Signs permits in Seattle: fees, timeline & requirements (2026)

Everything you need to know about pulling a sign permit in Seattle, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Seattle Department of Construction & Inspections (SDCI).

Look up your Seattle address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Seattle's source.

Permit required?
Always
Permit fee
Where a sign needs an SDCI permit (every electric sign, and a sign over 5 square feet outside the allowances of SMC 23.55.012), the fee is $193.20 for the first 32 square feet of display area plus $31.45 for each 10 square feet more up to 100, rising by size from there; a sign painted or applied directly on a wall is capped at $884.
Review timeline
Not published by the city

When does a sign need a permit in Seattle?

Seattle requires a sign permit from SDCI to install or alter any sign larger than 5 square feet or connected to electrical power, and to install or alter an awning, including re-covering one or changing the business name on it; the electrical permit for a lit sign is included in the sign permit. The permit requirements are in the Seattle Building Code and Title 22, and the Sign Code (SMC 23.55) sets the size, number and location of signs allowed in each zone (SMC 23.55.002). In neighborhood residential zones, temporary real estate, contractor and noncommercial signs may total 8 square feet per lot (SMC 23.55.012), and flashing and message-board signs are not allowed (SMC 23.55.020). A sign that extends over a street, sidewalk or alley may also need an SDOT street use permit.

In the source's own words

“A sign permit allows you to install, alter, or retrofit lighting for any sign that has an area larger than 5 square feet or is connected to an electrical power source, including outline and border tube lighting.”
Source ↗verified 2026-10-24

Required submittals

  • Site / elevation plan
  • Sign drawing with dimensions + materials
  • Structural calc if freestanding
  • Electrical detail if illuminated

Inspection sequence

  1. Footing if freestanding
  2. Electrical rough-in if illuminated
  3. Final

Contractor specialties needed

General contractor · Electrician (journey-level 01 or residential 02)

Who can do this work in Seattle?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Seattle and King County. Kolmo prepares the drawings and submittals, files the sign permit with Seattle Department of Construction & Inspections (SDCI), carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Seattle sign quote.

Notes & caveats

Issuing body is city building dept (structural review) often with planning sign-off (zoning compliance). Electrical permit required for illuminated signs. Historic-district signs get separate review.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your sign in Seattle — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: the 4 documents under Required submittals above.
  3. 3. Submit through the city portal: Seattle Department of Construction & Inspections (SDCI) ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Seattle's fee schedule sets them) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Seattle Department of Construction & Inspections (SDCI), handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Signs permits in Seattle — FAQ

When does a sign need a permit in Seattle?

Seattle requires a sign permit from SDCI to install or alter any sign larger than 5 square feet or connected to electrical power, and to install or alter an awning, including re-covering one or changing the business name on it; the electrical permit for a lit sign is included in the sign permit. The permit requirements are in the Seattle Building Code and Title 22, and the Sign Code (SMC 23.55) sets the size, number and location of signs allowed in each zone (SMC 23.55.002). In neighborhood residential zones, temporary real estate, contractor and noncommercial signs may total 8 square feet per lot (SMC 23.55.012), and flashing and message-board signs are not allowed (SMC 23.55.020). A sign that extends over a street, sidewalk or alley may also need an SDOT street use permit.

How much does a sign permit cost in Seattle?

Where a sign needs an SDCI permit (every electric sign, and a sign over 5 square feet outside the allowances of SMC 23.55.012), the fee is $193.20 for the first 32 square feet of display area plus $31.45 for each 10 square feet more up to 100, rising by size from there; a sign painted or applied directly on a wall is capped at $884. An awning or canopy is a separate permit priced on its value through the Development Fee Index. A sign's circuit takes an SDCI electrical permit ($26.28 up to 25 amps, plus the $55.48 administrative fee), and a 5% technology fee is added (SMC 22.900D.160).