Always
Permit fee
Where a project needs drainage review, SDCI's minimum is one hour at $292, due at intake, with further hours at $292; grading or drainage review outside a development permit starts at half an hour for each review type, and an environmentally critical area review at half an hour, plus the 5% technology fee (SMC 22.900D.145).
Review timeline
Not published by the city

When does drainage work need a permit in Seattle?

Ecology's Stormwater Management Manual for Western Washington (SWMMWW, 2024 edition) is the state floor. A municipal stormwater permittee may instead adopt a regional manual Ecology has determined equivalent, and most do — some counties publish their own, some cities publish their own, and others adopt Ecology's directly. Which manual applies is a per-jurisdiction fact and it changes the numbers: review thresholds for new plus replaced impervious surface and for land-disturbing activity differ between manuals, so read this jurisdiction's own adopting chapter before quoting one. Critical-area and closed-basin parcels get stricter review under every manual.

From Seattle's own code

“A. Thresholds for drainage control review. Drainage control review and approval as described in subsection 22.807.020.B is required for any of the following: 1. Preliminary drainage review and approval is required for applications for the following approvals:”
Source ↗verified 2026-09-07

What Seattle says in its own permit handout

From Construction Permit Checklist - Single-Family Add Alt, published by Seattle. This is the jurisdiction's own guidance on its permit process, not the ordinance text — where the two differ, the code governs.

“1. Drainage Plans (DWC and CSC/SOIL Plans) are not required for projects with less than 750 sf of new plus replaced hard surface and/or 5,000 sf of land disturbing activity unless the project is in an environmentally critical area (ECA) or buffer. Preparation by a licensed civil engineer is required if there is 5,000 sf of more of new plus replaced hard surface.”
Checklist ↗read 2026-09-05

Required submittals

  • Drainage report (full or simplified)
  • Site plan with impervious calc
  • BMP / facility detail
  • Geotech if infiltration claimed

Inspection sequence

  1. Pre-construction (BMPs in place)
  2. Facility installation
  3. Final stabilization

Contractor specialties needed

General contractor

Who can do this work in Seattle?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Seattle and King County. Kolmo prepares the drawings and submittals, files the stormwater / drainage permit with Seattle Department of Construction & Inspections (SDCI), carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Seattle stormwater / drainage quote.

Notes & caveats

Issuing body is city public works / county DPER, often parallel to the building permit. On-site infiltration / detention required where infeasible to discharge to municipal storm. Critical-area parcels (steep slope, salmon-bearing watercourse) get more conservative review.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your drainage work in Seattle — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
  2. 2. Assemble submittals: the 4 documents under Required submittals above.
  3. 3. Submit through the city portal: Seattle Department of Construction & Inspections (SDCI) ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Seattle's fee schedule sets them) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Seattle Department of Construction & Inspections (SDCI), handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Stormwater permits in Seattle — FAQ

When does drainage work need a permit in Seattle?

Ecology's Stormwater Management Manual for Western Washington (SWMMWW, 2024 edition) is the state floor. A municipal stormwater permittee may instead adopt a REGIONAL manual Ecology has determined equivalent, and most do — some counties publish their own, some cities publish their own, and others adopt Ecology's directly. WHICH MANUAL APPLIES IS A PER-JURISDICTION FACT and it changes the numbers: review thresholds for new plus replaced impervious surface and for land-disturbing activity differ between manuals, so read this jurisdiction's own adopting chapter before quoting one. Critical-area and closed-basin parcels get stricter review under every manual.

How much does a stormwater / drainage permit cost in Seattle?

Where a project needs drainage review, SDCI's minimum is one hour at $292, due at intake, with further hours at $292; grading or drainage review outside a development permit starts at half an hour for each review type, and an environmentally critical area review at half an hour, plus the 5% technology fee (SMC 22.900D.145). Connecting a drain to the storm drain, combined sewer or an on-site infiltration system is a separate Seattle Public Utilities permit, $375 for each connection and $375 for each repair (Director's Rule FIN-220.2).