Demolition permits in Shoreline: fees, timeline & requirements (2026)
Everything you need to know about pulling a demolition permit in Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline Planning & Community Development.
Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Shoreline's source.
When does a demolition need a permit in Shoreline?
2021 IBC Section 105.1 + WA-adopted IRC R105.1: demolition of any structure or portion thereof requires a permit. Tear-out of interior finishes only is generally treated as alteration. Asbestos / lead notification often required separately under WAC 173-303 / 296-62.
How Shoreline adopted this rule
The threshold comes from the state code (WAC 51.51), which Shoreline adopts by reference in the provision quoted below.
“The city of Shoreline hereby adopts the following codes for the purpose of establishing rules and regulations for the construction, alteration, removal, demolition, equipment, use and occupancy, location and maintenance of buildings, premises and structures, including permits and penalties: A. The current edition of the International Building Code, International Existing Building Code and International Swimming Pool and Spa Code, published by the International Code Council, Inc., as adopted by the Washington State Building Code Council in Chapter 51-50 WAC, as now or hereafter amended. B.”Source ↗verified 2026-05-17
Required submittals
- Site plan
- Utility disconnect confirmations
- Asbestos survey (pre-1981 structures)
- Erosion / sediment control plan
- Haul route if structure >1500 sq ft
Inspection sequence
- Pre-demo (utilities + erosion)
- Mid-demo if multi-day
- Final site stabilization
Contractor specialties needed
General contractor
Who can do this work in Shoreline?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Shoreline and King County. Kolmo prepares the drawings and submittals, files the demolition permit with Shoreline Planning & Community Development, carries the project through review and inspections, and performs the demolition. Call (206) 410-5100 for a Shoreline demolition quote.
Notes & caveats
Demolition Permit required separately from the Building Permit when removing a building (Residential Additions checklist — Additional Permits > Demolition Permit). Construction and Demolition Waste Diversion handout applies; Waste Diversion Plan and Salvage Assessment required when demolition is proposed.
How to apply yourself
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your demolition in Shoreline — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
- 2. Assemble submittals: the 5 documents under Required submittals above.
- 3. Submit through the city portal: Shoreline Planning & Community Development ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (Shoreline's fee schedule sets them) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Shoreline Planning & Community Development, handles reviewer comments, and does the demolition.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Demolition permits in Shoreline — FAQ
When does a demolition need a permit in Shoreline?
2021 IBC Section 105.1 + WA-adopted IRC R105.1: demolition of any structure or portion thereof requires a permit. Tear-out of interior finishes only is generally treated as alteration. Asbestos / lead notification often required separately under WAC 173-303 / 296-62.
How much does a demolition permit cost in Shoreline?
Shoreline's demolition permit is $853. Capping the side sewer, where the City's wastewater utility serves the lot, is billed at $267 an hour with a 2-hour minimum. A 4% technology surcharge is added to the demolition permit (SMC FEE.010). Apply electronically via eTRAKiT (https://www.shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account).