Kitchen remodel permits in Shoreline: fees, timeline & requirements (2026)
Everything you need to know about pulling a kitchen remodel permit in Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline Planning & Community Development.
Free lookup, no account needed — the office that issues the permit at your address, and a layout of the room, cited to Shoreline's source.
When does a kitchen remodel need a permit in Shoreline?
Simple interior remodel work (replacing cabinets, painting, tiling) does not need a permit unless it involves plumbing, electrical, or gas-line work, or moves walls.
In the source's own words
“Generally, simple interior remodel work like replacing cabinets, painting, tiling and the like does not typically need a permit unless the work involves plumbing, electrical or gas line work.”Source ↗verified 2026-05-17
Required submittals
- Permit Application and Critical Area Worksheet (Residential Interior Remodel checklist — Required Documents > Applications)
- Submittal Fee per City fee schedule (Residential Interior Remodel checklist — Required Documents > Submittal Fee)
- Construction Documents per Construction Documents handout (Residential Interior Remodel checklist — Required Documents > Construction Documents)
- Accessory Dwelling Unit (ADU) Worksheet — required when creating a new ADU or changing an existing ADU (Residential Interior Remodel checklist — Additional Documents > ADU Worksheet)
- Waste Diversion Plan and Salvage Assessment — required for construction/alterations exceeding 1,000 sq ft gross floor area, or when demolition is proposed (Residential Interior Remodel checklist — Additional Documents > Waste Diversion)
- Water Availability Certificate — required when adding new plumbing fixtures and property is served by North City Water District (Residential Interior Remodel checklist — Additional Documents > Water Availability Certificate)
Inspection sequence
- Rough-in (electrical/plumbing/mechanical)
- Insulation if walls opened
- Drywall
- Final
Contractor specialties needed
General contractor · Plumber · Mechanical contractor
Who can do this work in Shoreline?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Shoreline and King County. Kolmo prepares the drawings and submittals, files the kitchen remodel permit with Shoreline Planning & Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Shoreline kitchen remodel quote.
Notes & caveats
Interior-only — use Residential Interior Remodel checklist. Cosmetic refresh (cabinets, countertops, paint, flooring) without wall changes is exempt. Permit triggers: moving walls; relocated/added plumbing fixtures; new circuits; gas piping; range hood vented to exterior. Mechanical/Plumbing Permit must accompany Building Permit. Electrical permits via WA L&I.
Kitchen remodel permit fee estimate in Shoreline
Worked example for a $35,000 kitchen remodel project (building permit). Your actual fee scales with project valuation.
| Building permit fee | $507 |
| Plan review | $329.55 |
| WA state surcharge | $6.50 |
| Estimated total | $843.05 |
Shoreline prices a kitchen remodel's building permit on the value of the work, as supplied by the applicant or contractor: $267 up to $16,000, $75 for the first $2,000 plus $14 for each $1,000 more up to $25,000, and $397 for the first $25,000 plus $11 for each $1,000 more up to $50,000, then $672 for the first $50,000 plus $9 for each $1,000 more up to $100,000. Plan review is 65% of that fee, plus the $6.50 state building code fee. Plumbing and mechanical permits are each $267 including 4 fixtures or pieces of equipment, and $12 for each one more. Electrical permits come from L&I, at L&I's fees. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/
How to apply yourself
- 1. Check who issues the permit. Run an address lookup for your kitchen remodel in Shoreline — we'll confirm which office issues the permit at that address, and you can lay out the room.
- 2. Assemble submittals: the 6 documents under Required submittals above.
- 3. Submit through the city portal: Shoreline Planning & Community Development ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (about $843 for a $35,000 project) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Shoreline Planning & Community Development, handles reviewer comments, and builds the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Kitchen remodel permits in Shoreline — FAQ
When does a kitchen remodel need a permit in Shoreline?
Simple interior remodel work (replacing cabinets, painting, tiling) does not need a permit unless it involves plumbing, electrical, or gas-line work, or moves walls.
How much does a kitchen remodel permit cost in Shoreline?
For a $35,000 kitchen remodel project, the estimated Shoreline permit fee is about $843.05 (building fee $507 + plan review $329.55 + surcharges) from Shoreline's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.