Kitchen remodel permits in City of Shoreline: fees, timeline & requirements (2026)
Everything you need to know about pulling a kitchen remodel permit in City of Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline uses its own permit center..
When does a kitchen remodel need a permit in City of Shoreline?
Simple interior remodel work (replacing cabinets, painting, tiling) does not need a permit unless it involves plumbing, electrical, or gas-line work, or moves walls.
From City of Shoreline's own page
“Generally, simple interior remodel work like replacing cabinets, painting, tiling and the like does not typically need a permit unless the work involves plumbing, electrical or gas line work.”Source ↗verified 2026-05-17
Required submittals
- Permit Application and Critical Area Worksheet (Residential Interior Remodel checklist — Required Documents > Applications)
- Submittal Fee per City fee schedule (Residential Interior Remodel checklist — Required Documents > Submittal Fee)
- Construction Documents per Construction Documents handout (Residential Interior Remodel checklist — Required Documents > Construction Documents)
- Accessory Dwelling Unit (ADU) Worksheet — required when creating a new ADU or changing an existing ADU (Residential Interior Remodel checklist — Additional Documents > ADU Worksheet)
- Waste Diversion Plan and Salvage Assessment — required for construction/alterations exceeding 1,000 sqft gross floor area, or when demolition is proposed (Residential Interior Remodel checklist — Additional Documents > Waste Diversion)
- Water Availability Certificate — required when adding new plumbing fixtures AND property is served by North City Water District (Residential Interior Remodel checklist — Additional Documents > Water Availability Certificate)
Inspection sequence
- rough-in (electrical/plumbing/mechanical)
- insulation if walls opened
- drywall
- final
Contractor specialties needed
general, plumbing, mechanical
Notes & caveats
Interior-only — use Residential Interior Remodel checklist. Cosmetic refresh (cabinets, countertops, paint, flooring) without wall changes is exempt. Permit triggers: moving walls; relocated/added plumbing fixtures; new circuits; gas piping; range hood vented to exterior. Mechanical/Plumbing Permit must accompany Building Permit. Electrical permits via WA L&I.
Kitchen remodel permit fee estimate in City of Shoreline
Worked example for a $35,000 kitchen remodel project (building permit). Your actual fee scales with project valuation.
| Building permit fee | $492.25 |
| Plan review | $319.96 |
| WA state surcharge | $4.5 |
| Estimated total | $816.71 |
Apply electronically via eTRAKiT (https://www.shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account). Mechanical/Plumbing companion permits required where applicable. Computed from the City of Shoreline fee bracket schedule · source ↗. Impact/utility fees may apply separately.
How to apply
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Shoreline kitchen remodel — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
- 2. Assemble submittals (6).
- 3. Submit through the city portal: Shoreline uses its own permit center. ↗
- 4. Track review (typical: —). Respond to reviewer comments promptly.
- 5. Pay issuance fees (Apply electronically via eTRAKiT (https://www.shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account). Mechanical/Plumbing companion permits required where applicable.) and pick up the permit. Inspection card travels with the job.
Kitchen remodel permits in City of Shoreline — FAQ
When does a kitchen remodel need a permit in City of Shoreline?
Simple interior remodel work (replacing cabinets, painting, tiling) does not need a permit unless it involves plumbing, electrical, or gas-line work, or moves walls.
How much does a kitchen remodel permit cost in City of Shoreline?
For a $35,000 kitchen remodel project, the estimated City of Shoreline permit fee is about $816.71 — building fee $492.25 + plan review $319.96 + surcharges. Fees scale with project valuation per the city schedule.
