Kitchen remodel permits in Shoreline: fees, timeline & requirements (2026)

Everything you need to know about pulling a kitchen remodel permit in Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline Planning & Community Development.

Look up your Shoreline address

Free lookup, no account needed — the office that issues the permit at your address, and a layout of the room, cited to Shoreline's source.

Permit required?
Permit if: plumbing moved or added · a sink or other fixture replaced, even in the same spot · a faucet replaced · a defective trap, drain, waste or vent pipe replaced · new or moved electrical circuits · gas, venting or mechanical work · a wall moved or removed, or structural work.
Permit fee
About $843 for a $35,000 project, when a permit is needed
Review timeline
Not published by the city

When does a kitchen remodel need a permit in Shoreline?

Simple interior remodel work (replacing cabinets, painting, tiling) does not need a permit unless it involves plumbing, electrical, or gas-line work, or moves walls.

In the source's own words

“Generally, simple interior remodel work like replacing cabinets, painting, tiling and the like does not typically need a permit unless the work involves plumbing, electrical or gas line work.”
Source ↗verified 2026-05-17

Required submittals

  • Permit Application and Critical Area Worksheet (Residential Interior Remodel checklist — Required Documents > Applications)
  • Submittal Fee per City fee schedule (Residential Interior Remodel checklist — Required Documents > Submittal Fee)
  • Construction Documents per Construction Documents handout (Residential Interior Remodel checklist — Required Documents > Construction Documents)
  • Accessory Dwelling Unit (ADU) Worksheet — required when creating a new ADU or changing an existing ADU (Residential Interior Remodel checklist — Additional Documents > ADU Worksheet)
  • Waste Diversion Plan and Salvage Assessment — required for construction/alterations exceeding 1,000 sq ft gross floor area, or when demolition is proposed (Residential Interior Remodel checklist — Additional Documents > Waste Diversion)
  • Water Availability Certificate — required when adding new plumbing fixtures and property is served by North City Water District (Residential Interior Remodel checklist — Additional Documents > Water Availability Certificate)

Inspection sequence

  1. Rough-in (electrical/plumbing/mechanical)
  2. Insulation if walls opened
  3. Drywall
  4. Final

Contractor specialties needed

General contractor · Plumber · Mechanical contractor

Who can do this work in Shoreline?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Shoreline and King County. Kolmo prepares the drawings and submittals, files the kitchen remodel permit with Shoreline Planning & Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Shoreline kitchen remodel quote.

Notes & caveats

Interior-only — use Residential Interior Remodel checklist. Cosmetic refresh (cabinets, countertops, paint, flooring) without wall changes is exempt. Permit triggers: moving walls; relocated/added plumbing fixtures; new circuits; gas piping; range hood vented to exterior. Mechanical/Plumbing Permit must accompany Building Permit. Electrical permits via WA L&I.

Kitchen remodel permit fee estimate in Shoreline

Worked example for a $35,000 kitchen remodel project (building permit). Your actual fee scales with project valuation.

Building permit fee$507
Plan review$329.55
WA state surcharge$6.50
Estimated total$843.05

Shoreline prices a kitchen remodel's building permit on the value of the work, as supplied by the applicant or contractor: $267 up to $16,000, $75 for the first $2,000 plus $14 for each $1,000 more up to $25,000, and $397 for the first $25,000 plus $11 for each $1,000 more up to $50,000, then $672 for the first $50,000 plus $9 for each $1,000 more up to $100,000. Plan review is 65% of that fee, plus the $6.50 state building code fee. Plumbing and mechanical permits are each $267 including 4 fixtures or pieces of equipment, and $12 for each one more. Electrical permits come from L&I, at L&I's fees. A 4% technology surcharge is added to the City's permit fees (SMC FEE.010). Apply electronically via eTRAKiT (shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account). Computed from Shoreline's adopted fee schedule · source ↗. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

How to apply yourself

  1. 1. Check who issues the permit. Run an address lookup for your kitchen remodel in Shoreline — we'll confirm which office issues the permit at that address, and you can lay out the room.
  2. 2. Assemble submittals: the 6 documents under Required submittals above.
  3. 3. Submit through the city portal: Shoreline Planning & Community Development ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (about $843 for a $35,000 project) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Shoreline Planning & Community Development, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Kitchen remodel permits in Shoreline — FAQ

When does a kitchen remodel need a permit in Shoreline?

Simple interior remodel work (replacing cabinets, painting, tiling) does not need a permit unless it involves plumbing, electrical, or gas-line work, or moves walls.

How much does a kitchen remodel permit cost in Shoreline?

For a $35,000 kitchen remodel project, the estimated Shoreline permit fee is about $843.05 (building fee $507 + plan review $329.55 + surcharges) from Shoreline's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.