Right-of-way permits in City of Shoreline: fees, timeline & requirements (2026)

Everything you need to know about pulling a right-of-way permit in City of Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline uses its own permit center..

Permit required?
Yes — see threshold below
Permit fee
ROW permit fees vary widely by city; commonly $150-$500 for residential driveway/curb cut, plus per-day occupancy if street obstruction. Apply electronically via eTRAKiT (https://www.shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account).
Review timeline

When does a right-of-way need a permit in City of Shoreline?

Issued by city public works (or SDOT in Seattle) under local ROW ordinance. Triggered by physical occupation of or work within the public ROW including driveway aprons, curb cuts, sidewalk replacement, utility tie-ins, hauling routes, and temporary construction staging.

Required submittals

  • ROW work plan / sketch
  • traffic-control plan if arterial
  • certificate of insurance
  • bond if required

Inspection sequence

  1. pre-construction
  2. subgrade / base
  3. final ROW restoration

Contractor specialties needed

general

Notes & caveats

Right-of-Way Use Permit required separately. Civil Engineering Plans must meet frontage requirements per SMC 20.70.320. Frontage improvements are NOT required when adding an ADU (per ADU Handout).

Right-of-way permit fee estimate in City of Shoreline

Worked example for a $25,000 right-of-way project (building permit). Your actual fee scales with project valuation.

Building permit fee$391.25
Plan review$254.31
WA state surcharge$4.5
Estimated total$650.06

ROW permit fees vary widely by city; commonly $150-$500 for residential driveway/curb cut, plus per-day occupancy if street obstruction. Apply electronically via eTRAKiT (https://www.shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account). Computed from the City of Shoreline fee bracket schedule · source ↗. Impact/utility fees may apply separately.

How to apply

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Shoreline right-of-way — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (4).
  3. 3. Submit through the city portal: Shoreline uses its own permit center.
  4. 4. Track review (typical: ). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (ROW permit fees vary widely by city; commonly $150-$500 for residential driveway/curb cut, plus per-day occupancy if street obstruction. Apply electronically via eTRAKiT (https://www.shorelinewa.gov/government/departments/planning-community-development/permit-center-remote-services/register-for-a-professional-etrakit-account).) and pick up the permit. Inspection card travels with the job.

Right-of-way permits in City of Shoreline — FAQ

When does a right-of-way need a permit in City of Shoreline?

Issued by city public works (or SDOT in Seattle) under local ROW ordinance. Triggered by physical occupation of or work within the public ROW including driveway aprons, curb cuts, sidewalk replacement, utility tie-ins, hauling routes, and temporary construction staging.

How much does a right-of-way permit cost in City of Shoreline?

For a $25,000 right-of-way project, the estimated City of Shoreline permit fee is about $650.06 — building fee $391.25 + plan review $254.31 + surcharges. Fees scale with project valuation per the city schedule.

City of Shoreline resourcesPermit portal ↗Fee schedule ↗