Solar permits in City of Shoreline: fees, timeline & requirements (2026)

Everything you need to know about pulling a rooftop solar / PV permit in City of Shoreline, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Shoreline Planning & Community Development.

Look up your City of Shoreline address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Shoreline's source.

City of Shoreline: we don't yet have an authoritative rooftop solar / PV rule on file for this city. Until we verify, fall back to Washington-state baseline code (IRC/IBC/WSEC) and the county building department. Call Shoreline Planning & Community Development for project-specific guidance.

Who can do this work in City of Shoreline?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Shoreline and King County. Kolmo prepares the drawings and submittals, files the rooftop solar / PV permit with Shoreline Planning & Community Development, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Shoreline rooftop solar / PV quote.

Solar permit fee estimate in City of Shoreline

Worked example for a $25,000 rooftop solar / PV project (building permit). Your actual fee scales with project valuation.

Building permit fee$397
Plan review$258.05
WA state surcharge$6.50
Estimated total$661.55

$14,000.01-$25,000: $75 for the first $2,000 + $14 for each additional $1,000, or fraction thereof, to and including $25,000. Stored as $243, the row's own fee at $14,000 (75 + 12 x 14), so the increments count from $14,000: $257 at $14,000.01, $397 at $25,000. The handout's row prices $14,000.01 below the $267 flat fee; it is recorded as written. Computed from City of Shoreline's adopted fee schedule · source ↗. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Shoreline rooftop solar / PV — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (site plan, scope-of-work, photos).
  3. 3. Submit through the city portal: Shoreline Planning & Community Development ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (see fee schedule) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull rooftop solar / PV permits in City of Shoreline every month. We prepare the drawings and submittals, file with Shoreline Planning & Community Development, handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Solar permits in City of Shoreline — FAQ

How much does a rooftop solar / PV permit cost in City of Shoreline?

For a $25,000 rooftop solar / PV project, the estimated City of Shoreline permit fee is about $661.55 (building fee $397 + plan review $258.05 + surcharges) from City of Shoreline's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

City of Shoreline resourcesPermit portal ↗Fee schedule ↗