Addition permits in Tacoma: fees, timeline & requirements (2026)
Everything you need to know about pulling a home addition permit in Tacoma, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Tacoma Planning & Development Services.
Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Tacoma's source.
When does a home addition need a permit in Tacoma?
Permit required for any addition to an existing building, OR any new accessory structure ≥200 sqft. Alteration/addition <80% of building valuation = Residential Alteration (BLDRA) permit. ≥80% = Residential New Construction (BLDRN) permit (which subsumes site-development review).
How Tacoma adopted this rule
The threshold comes from the state code (WAC 51.51), which Tacoma adopts by reference in the provision quoted below.
“The International Building Code, International Residential Code, and International Existing Building Code, as adopted and amended by the Washington State Building Code Council under the State Building Code, as defined in TMC § 2.02.100, are hereby adopted as the official Building Code of the City of Tacoma. The Tacoma Building Code as defined in TMC § 2.02.100 is also amended to include the adoption of IBC Appendix Chapter G, the adoption of IEBC Appendix A, and a new Appendix J added to the IEBC.”Source ↗verified 2026-04-29
What Tacoma says in its own permit handout
From Residential Garages and Sheds, published by Tacoma. This is the jurisdiction's own guidance on its permit process, not the ordinance text — where the two differ, the code governs.
“A building permit is required for any addition to an existing building or for any new accessory structure that is 200 square feet or larger.”Handout ↗read 2026-09-05
Required submittals
- Site plan to scale 1"=20'
- Floor plan 1/4"=1'
- Building elevations
- Foundation plan
- Roof framing plan
- Wall sections
- Plumbing/mechanical plans
Inspection sequence
- Foundation/footing
- Plumbing rough-in
- Electrical rough-in
- Mechanical rough-in
- Framing
- Insulation
- Drywall
- Final
Contractor specialties needed
General contractor
Who can do this work in Tacoma?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Tacoma and Pierce County. Kolmo prepares the drawings and submittals, files the home addition permit with Tacoma Planning & Development Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Tacoma home addition quote.
Notes & caveats
From Tacoma residential-permit-process tip sheet: "BLDRA (Residential Alteration/Addition) — Remodels, additions, alterations of less than 80% building valuation, miscellaneous structures without living space or storage space (i.e. walls, fences, pools)." From garages-and-sheds tip sheet: "A building permit is required for any addition to an existing building or for any new accessory structure that is 200 square feet or larger." Applies to single-family + duplex + townhomes (≤6 units, ≤3 stories).
Addition permit fee estimate in Tacoma
Worked example for a $120,000 home addition project (building permit). Your actual fee scales with project valuation.
| Combination permit fee, addition (2.81% of valuation) | $3,372 |
| Plan review | $1,517.40 |
| Site development permit and review | $3,709.20 |
| Technology Program (5%) | $429.93 |
| Natural Resources Program (5%) | $429.93 |
| Reserve Fund (2%) | $171.97 |
| Emergency Preparedness (5% of permit fees) | $278.19 |
| WA state surcharge | $6.50 |
| Estimated total | $9,915.12 |
Tacoma prices a single-family or duplex addition as one combination building, mechanical and plumbing permit (PDS Fee Schedule Table 8-4): 2.81% of the ICC Building Valuation Data value of the added floor area, plan review at 45% of that fee, and a site development permit (grading and erosion control) at 65% with its plan review at 45% of the building permit fee. Table 1 adds the Technology Program (5%), Natural Resources Program (5%) and Reserve Fund (2%) on permit and plan review fees and Emergency Preparedness (5%) on permit fees; the state building code fee is $6.50. Electrical permits are separate, issued by Tacoma Power (TMC 12.06A). Computed from Tacoma's adopted fee schedule · source ↗. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.
How to apply yourself
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your home addition in Tacoma — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline, critical-area or historic overlays.
- 2. Assemble submittals: the 7 documents under Required submittals above.
- 3. Submit through the city portal: Tacoma Planning & Development Services ↗
- 4. Track review (typical: 30–90 days). Respond to reviewer comments promptly.
- 5. Pay issuance fees (about $9,915 for a $120,000 project) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo prepares the drawings and submittals, files with Tacoma Planning & Development Services, handles reviewer comments, and builds the project.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Addition permits in Tacoma — FAQ
When does a home addition need a permit in Tacoma?
Permit required for any addition to an existing building, OR any new accessory structure ≥200 sqft. Alteration/addition <80% of building valuation = Residential Alteration (BLDRA) permit. ≥80% = Residential New Construction (BLDRN) permit (which subsumes site-development review).
How much does a home addition permit cost in Tacoma?
For a $120,000 home addition project, the estimated Tacoma permit fee is about $9,915.12 (building fee $3,372 + plan review $1,517.40 + site development $3,709.20 + surcharges) from Tacoma's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.
How long does Tacoma take to review a home addition permit?
Typical review window: 30–90 days.
