Basement finish permits in City of Tacoma: fees, timeline & requirements (2026)

Everything you need to know about pulling a basement finish permit in City of Tacoma, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Tacoma Planning & Development Services.

Look up your City of Tacoma address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to City of Tacoma's source.

Permit required?
Always
Permit fee
Plan-review fee scales with valuation. State surcharge $6.50.
Review timeline
14–30 days

When does a basement finish need a permit in City of Tacoma?

2021 IRC R310: every sleeping room below grade requires emergency escape and rescue opening (egress window). Min sill height 44in, min net clear opening 5.7 sq ft (5.0 grade-floor), min width 20in, height 24in. Ceiling height min 7ft (R305). Entire newly conditioned area must comply with WSEC R402.

How City of Tacoma adopted this rule

The threshold comes from the state code (WAC 51.51), which City of Tacoma adopts by reference in the provision quoted below.

“The International Building Code, International Residential Code, and International Existing Building Code, as adopted and amended by the Washington State Building Code Council under the State Building Code, as defined in TMC § 2.02.100 , are hereby adopted as the official Building Code of the City of Tacoma. The Tacoma Building Code as defined in TMC § 2.02.100 is also amended to include the adoption of IBC Appendix Chapter G, the adoption of IEBC Appendix A, and a new Appendix J added to the IEBC.”
Source ↗verified 2026-04-29

What City of Tacoma says in its own permit handout

From Converting a Basement to Living Space, published by City of Tacoma. This is the jurisdiction's own guidance on its permit process, not the ordinance text — where the two differ, the code governs.

“Emergency Escape – The basement must have at least one emergency egress window or a door directly to the exterior. If you are creating a bedroom, the egress window or door must be within the bedroom itself. Egress windows shall provide 5.7 square feet of openable area, with a minimum openable width of 20" and a minimum openable height to 24". The sill height may be a maximum of 44" above the finished floor.”
Handout ↗read 2026-09-05

Required submittals

  • floor plan w/ egress windows + ceiling heights
  • electrical layout
  • plumbing diagram
  • mechanical / HVAC plan
  • WSEC compliance form (newly conditioned space)
  • smoke/CO alarm locations

Inspection sequence

  1. rough-in (electrical/plumbing/mechanical)
  2. framing
  3. insulation
  4. drywall
  5. final

Contractor specialties needed

general, electrical-01-or-02, plumbing

Who can do this work in City of Tacoma?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout City of Tacoma and Pierce County. Kolmo prepares the drawings and submittals, files the basement finish permit with Tacoma Planning & Development Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a City of Tacoma basement finish quote.

Notes & caveats

Tacoma's residential alteration permit (BLDRA) covers "remodels, additions, alterations of less than 80% building valuation." Basement conversion to habitable space falls under BLDRA — includes building, plumbing, mechanical, and site development as needed. (Specific source-page coverage of basement conversion is implicit; see WA-baseline IRC R105.1 floor.)

Basement finish permit fee — Washington baseline, not City of Tacoma's own schedule

Worked example for a $40,000 basement finish project (building permit). Your actual fee scales with project valuation.

Building permit fee$542.75
Plan review$352.79
WA state surcharge$6.5
Estimated total$902.04

Plan-review fee scales with valuation. State surcharge $6.50. We have not read City of Tacoma's adopted fee schedule, so this is not City of Tacoma's fee: it walks the standard valuation table most Washington cities adopt by reference, as a rough guide. The real numbers are in City of Tacoma's fee schedule ↗. Impact/utility fees may apply separately.

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your City of Tacoma basement finish — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (6).
  3. 3. Submit through the city portal: Tacoma Planning & Development Services ↗
  4. 4. Track review (typical: 14–30 days). Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (Plan-review fee scales with valuation. State surcharge $6.50.) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

We pull basement finish permits in City of Tacoma every month. We prepare the drawings and submittals, file with Tacoma Planning & Development Services, handle reviewer comments, and build the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Basement finish permits in City of Tacoma — FAQ

When does a basement finish need a permit in City of Tacoma?

2021 IRC R310: every sleeping room below grade requires emergency escape and rescue opening (egress window). Min sill height 44in, min net clear opening 5.7 sq ft (5.0 grade-floor), min width 20in, height 24in. Ceiling height min 7ft (R305). Entire newly conditioned area must comply with WSEC R402.

How much does a basement finish permit cost in City of Tacoma?

For a $40,000 basement finish project, the estimated City of Tacoma permit fee is about $902.04 — building fee $542.75 + plan review $352.79 + surcharges. Fees scale with project valuation per the city schedule.

How long does City of Tacoma take to review a basement finish permit?

Typical review window: 14–30 days.

City of Tacoma resourcesPermit portal ↗Fee schedule ↗