Siding permits in Tacoma: fees, timeline & requirements (2026)

Everything you need to know about pulling a siding permit in Tacoma, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to Tacoma Planning & Development Services.

Look up your Tacoma address

Free lookup, no account needed — the office that issues the permit at your address, cited to Tacoma's source.

Permit required?
Always
Permit fee
About $853 for an $18,000 project
Review timeline
Not published by the city

When does siding replacement need a permit in Tacoma?

The state code exempts no siding replacement, and the local code adds no exemption: re-siding needs a permit. Patching a few boards without cutting into the wall is an ordinary repair.

How Tacoma adopted this rule

The threshold comes from the state code (WAC 51.51), which Tacoma adopts by reference in the provision quoted below.

“The International Building Code, International Residential Code, and International Existing Building Code, as adopted and amended by the Washington State Building Code Council under the State Building Code, as defined in TMC § 2.02.100, are hereby adopted as the official Building Code of the City of Tacoma.”
Source ↗verified 2026-10-02

Required submittals

  • If permit required: WRB + flashing details, fastener schedule, WSEC continuous insulation calc if added

Inspection sequence

  1. WRB / flashing inspection
  2. Final

Contractor specialties needed

General contractor

Who can do this work in Tacoma?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Tacoma and Pierce County. Kolmo prepares the drawings and submittals, files the siding permit with Tacoma Planning & Development Services, carries the project through review and inspections, and performs the construction. Call (206) 410-5100 for a Tacoma siding quote.

Notes & caveats

WRB required behind all siding (IRC R703.2). Flashing at openings, kick-out flashings at roof-wall intersections (R703.4) inspected when permit issued.

Siding permit fee estimate in Tacoma

Worked example for an $18,000 siding project (building permit). Your actual fee scales with project valuation.

Combination permit fee, remodel (2.81% of valuation)$505.80
Plan review$227.61
Technology Program (5%)$36.67
Natural Resources Program (5%)$36.67
Reserve Fund (2%)$14.67
Emergency Preparedness (5% of permit fees)$25.29
WA state surcharge$6.50
Estimated total$853.21

Re-siding a house is priced as a single-family remodel combination permit: 2.81% of the value of the work, $180 at the least, with plan review at 45% of that fee; where the work qualifies as a residential remodel e-permit, it is based on the value with a $140 minimum and no plan review fee (PDS Fee Schedule Tables 8-4 and 3). Table 1 adds the technology (5%), emergency preparedness (5%) and reserve fund (2%) surcharges, and the natural resources program (5%) on building permits. Computed from Tacoma's adopted fee schedule · source ↗. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.

How to apply yourself

  1. 1. Check who issues the permit. Run an address lookup for your siding replacement in Tacoma — we'll confirm which office issues the permit at that address.
  2. 2. Assemble submittals: what Required submittals above lists.
  3. 3. Submit through the city portal: Tacoma Planning & Development Services ↗
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (about $853 for an $18,000 project) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo prepares the drawings and submittals, files with Tacoma Planning & Development Services, handles reviewer comments, and builds the project.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Siding permits in Tacoma — FAQ

When does siding replacement need a permit in Tacoma?

The state code exempts no siding replacement, and the local code adds no exemption: re-siding needs a permit. Patching a few boards without cutting into the wall is an ordinary repair.

How much does a siding permit cost in Tacoma?

For a $18,000 siding project, the estimated Tacoma permit fee is about $853.21 (building fee $505.80 + plan review $227.61 + surcharges) from Tacoma's adopted fee schedule. Land use, fire and engineering review, intake, impact and utility fees, where they apply, are charged separately.