Electrical permits in Woodinville: fees, timeline & requirements (2026)

Everything you need to know about pulling an electrical permit in Woodinville, Washington — when one is required, what it costs, how long review takes, what documents are required, and which inspections you can expect. Cited to WA Department of Labor & Industries (L&I).

Look up your Woodinville address

Free lookup, no account needed — your lot polygon, zoning, setbacks and overlays, cited to Woodinville's source.

Permit required?
Permit if: anything beyond like-in-kind replacement of a lamp, up to five switches or receptacles, one appliance or a breaker.
Permit fee
Electrical permit fees are set by circuit count and service size in the issuing agency's fee schedule.
Review timeline
Not published by the city

When does electrical work need a permit in Woodinville?

The City of Woodinville issues no electrical permits and does no electrical inspections: L&I does, under the National Electrical Code as L&I adopts it (WMC 21.62.030). Nearly all electrical work needs an L&I permit; L&I exempts only like-in-kind replacement of items such as a lamp, up to five switches or receptacles, one appliance or a breaker. The nearest L&I office is in Bellevue (616 120th Ave NE, Suite C201; 425-990-1400).

From Woodinville's own code

“The latest National Electrical Code as adopted and amended by the Department of Labor and Industries pursuant to Chapter 19.28 RCW is adopted.”
Source ↗verified 2026-11-07

Required submittals

  • Scope description
  • Load calc for service changes
  • Panel schedule for new panels

Inspection sequence

  1. Rough-in
  2. Service inspection (if applicable)
  3. Final

Contractor specialties needed

Electrician (journey-level 01 or residential 02)

Who can do this work in Woodinville?

Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Woodinville and King County. Kolmo manages the electrical job from start to finish: a licensed electrical contractor performs the work and the permit, and Kolmo coordinates the scope, schedule, inspections and any related construction. Call (206) 410-5100 for a Woodinville electrical quote.

Notes & caveats

Service upgrade: load calc per NEC 220. EV charger ≥40A: dedicated circuit + GFCI. AFCI required on most habitable-space circuits (NEC 210.12). Permit holder must hold L&I electrical contractor license (specialty 01 — general; 02 — residential ≤4 units; 03 — pump & irrigation; etc.).

How to apply yourself

  1. 1. Confirm your parcel's zoning & overlays. Run an address lookup for your Woodinville electrical — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
  2. 2. Assemble submittals (3).
  3. 3. Apply with WA Department of Labor & Industries (L&I).
  4. 4. Track review. Respond to reviewer comments promptly.
  5. 5. Pay issuance fees (WA Department of Labor & Industries (L&I) sets them) and pick up the permit. Inspection card travels with the job.

Or have Kolmo do it

Kolmo runs the job: a licensed electrical contractor does the electrical work and pulls the permit, and Kolmo coordinates the scope, schedule, inspections and any related construction.

(206) 410-5100

Licensed WA general contractor KOLMOL*753JS · bonded & insured

Electrical permits in Woodinville — FAQ

When does electrical work need a permit in Woodinville?

The City of Woodinville issues no electrical permits and does no electrical inspections: L&I does, under the National Electrical Code as L&I adopts it (WMC 21.62.030). Nearly all electrical work needs an L&I permit; L&I exempts only like-in-kind replacement of items such as a lamp, up to five switches or receptacles, one appliance or a breaker. The nearest L&I office is in Bellevue (616 120th Ave NE, Suite C201; 425-990-1400).

How much does an electrical permit cost in Woodinville?

Electrical permit fees are set by circuit count and service size in the issuing agency's fee schedule. Electrical permits here come from WA L&I, not the local permit office: apply and request inspections through L&I (https://lni.wa.gov/licensing-permits/electrical/electrical-basics-for-home-business-owners/electrical-permit-basics).

Woodinville resourcesPermit portal ↗Fee schedule ↗