When does a heat pump or ductless mini-split need a permit in Woodinville?
Installing or replacing a heat pump or ductless mini-split needs a mechanical permit in Woodinville: the City leaves the state mechanical code's exemptions unchanged (WMC 21.62.070), and those exempt only portable appliances and minor parts. Replacing an appliance in a single-family house is issued over the counter in the City's Permit Portal, with no plan review; with a building permit, the mechanical work is part of the Combined Building Permit. The circuit needs an electrical permit from L&I, which the City does not issue.
From Woodinville's own code
“The listings of exemptions for electrical, gas, plumbing and mechanical shall remain unchanged.”Source ↗verified 2026-11-07
Who can do this work in Woodinville?
Kolmo Construction is a licensed Washington general contractor — KOLMOL*753JS, active through April 10, 2027, bonded and insured — working throughout Woodinville and King County. Kolmo manages the heat pump / ductless mini-split job from start to finish: a licensed HVAC subcontractor performs the work and the permit, and Kolmo coordinates the scope, schedule, inspections and any related construction. Call (206) 410-5100 for a Woodinville heat pump / ductless mini-split quote.
Notes & caveats
Replacing a single-family furnace, heat pump or other appliance is a mechanical permit issued over the counter in the City's Permit Portal, with no plan review; a rooftop unit needs plan review. The City leaves the state mechanical code's exemptions unchanged (WMC 21.62.070), so only portable appliances, minor parts and small self-contained refrigeration units are exempt. The heat pump's circuit needs an L&I electrical permit and inspection.
How to apply yourself
- 1. Confirm your parcel's zoning & overlays. Run an address lookup for your Woodinville heat pump / ductless mini-split — we'll pull your specific lot polygon, zoning, setbacks, and any shoreline/ECA/historic overlays.
- 2. Assemble submittals (site plan, scope-of-work, photos).
- 3. Submit through the city portal: Woodinville Development Services ↗
- 4. Track review. Respond to reviewer comments promptly.
- 5. Pay issuance fees (Woodinville's fee schedule sets them) and pick up the permit. Inspection card travels with the job.
Or have Kolmo do it
Kolmo runs the job: a licensed HVAC subcontractor does the heat pump / ductless mini-split work and pulls the permit, and Kolmo coordinates the scope, schedule, inspections and any related construction.
Licensed WA general contractor KOLMOL*753JS · bonded & insured
Heat pump permits in Woodinville — FAQ
When does a heat pump or ductless mini-split need a permit in Woodinville?
Installing or replacing a heat pump or ductless mini-split needs a mechanical permit in Woodinville: the City leaves the state mechanical code's exemptions unchanged (WMC 21.62.070), and those exempt only portable appliances and minor parts. Replacing an appliance in a single-family house is issued over the counter in the City's Permit Portal, with no plan review; with a building permit, the mechanical work is part of the Combined Building Permit. The circuit needs an electrical permit from L&I, which the City does not issue.
How much does a heat pump / ductless mini-split permit cost in Woodinville?
Current fee per the Woodinville fee schedule: A heat pump is a mechanical permit in Woodinville, $119 plus $25 a fixture, where an appliance and its duct work or piping count as one (2026 Fee Schedule); replacing a single-family appliance is issued over the counter, with no plan review. On a Combined Building Permit the mechanical work adds $25 a fixture to the building permit instead. Where plan review applies, it is 65% of the building permit fee figured on the mechanical system's value alone. The circuit needs an L&I electrical permit, at L&I's fees. Apply through Woodinville's online Permit Portal (https://aca-prod.accela.com/woodinville/default.aspx); the Apply for a Permit Online page (https://www.woodinville.gov/347/Apply-for-a-Permit-Online) explains the account setup.