Attached ADU (AADU) Permits in Federal Way
An ADU built inside or attached to the primary residence — basement conversion, garage conversion, or bump-out addition. Lower cost; constrained by the primary footprint.
Free lookup: your lot’s zoning and setbacks, with an attached ADU placed on it to move and turn.
Permit fees in Federal Way
Set by the Federal Way fee schedule.
Federal Way fee scheduleFederal Way prices an ADU's building permit on the value of the work (the ICC's building valuation data, or a bid the Building Official approves), off Valuation Table A: $1,531.67 for the first $50,000 plus $16.24 for each $1,000 more up to $100,000, and $2,343.58 for the first $100,000 plus $13.17 for each $1,000 more up to $500,000. Plan review is 65% of the building permit fee, single-family plans carry a $60 digitizing fee, and the $6.50 state building code fee and the automation fee (the greater of $43 or 5% of the permit fee) apply. The park impact fee for an ADU is $0.84 a square foot, $522 at the least and $2,624 at the most, plus the City's 5% administrative fee; the school impact fee for an ADU is $0 (2026 Fee Schedule).
Review timeline
Not published by Federal Way.
What Federal Way asks for with an attached ADU
Every application (7)
- Construction permit application, through the City's document upload link
- Single Family Remodel Checklist, completed (the Residential Checklist for an addition)
- Certificate of Water Availability, from the water purveyor (with fire flow calculations for an addition)
- Certificate of Sewer Availability, or King County septic approval on a septic lot
- Fire access, hydrant distance and fire flow (South King Fire & Rescue), or fire sprinklers
- Site plan
- Floor plan
Where the lot or the work calls for it
Where the ADU adds onto the house or changes its structure
- Tree retention plan with the tree unit calculation (FWRC 19.120.130)
- Drainage and erosion control plan
- Structural calculations, stamped by a Washington professional engineer
Where the ADU adds onto the house or changes its outside walls, windows or roof
- Typical building / wall section
- Major materials schedule
Where the work changes the outside walls, windows or roof
- Building elevations N/S/E/W
- Glazing + door schedule (NFRC U-factor / SHGC)
- WSEC energy compliance, on the plans
- WSEC-R compliance forms (WSU Energy Program), uploaded as a PDF
Each where the condition beside it holds
- Soils infiltration report (2,000 sq ft of new impervious area, on a lot under 22,000 sq ft or one proposing infiltration)
From the city’s own documents: City of Federal Way — Permit Center · City of Federal Way — Single Family Remodel Checklist, Bulletin #156 (February 23, 2026) · City of Federal Way — Accessory Dwelling Unit (ADU) Informational Handout, Bulletin #048 (June 2025) and 4 more, last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.
The other 4 documents
- City of Federal Way — Single Family Residential Checklist, Bulletin #106 (February 23, 2026)
- City of Federal Way — Single-Family Residential Drainage Plans, Bulletin #207 (November 9, 2016)
- City of Federal Way — Garage Conversion Submittal Requirements, Bulletin #171
- City of Federal Way — 2021 Washington State Energy Code – Residential (WSEC-R) (updated 10.15.2024)
AADU-specific requirements
- Egress on every bedroom — IRC R310 net clear opening ≥5.7 sf; sill ≤44″ from floor.
- Smoke + CO alarms — interconnected throughout primary + AADU per IRC R314/R315.
- 1-hr separation — required between AADU and primary in some cases; otherwise a continuous draft stop.
- Independent kitchen + bath — full plumbing + cooking provision in the AADU.
- Address or unit number — the city or county assigns addresses; ask the permit center whether the unit gets its own.