ADU Permits in Washington State

A detached cottage or a unit inside or attached to the house — Washington HB 1337 requires cities to allow two of these on a lot in a single-family zone, except on lots with critical areas. Setback, size, and parking rules still vary city-by-city.

Free lookup. Resolves zoning, setbacks, and which ADU types your parcel allows in seconds.

Seattle ADU permits: key facts (2026)

  • Seattle permits attached and detached ADUs through an SDCI Construction Permit (Addition or Alteration); legalizing an existing unpermitted unit uses a Construction Permit Establishing Use.
  • For a pre-approved DADU plan SDCI says: "In most cases, you can get your permit in just 2-6 weeks." It publishes no typical review time for a custom ADU.
  • After the permit is issued, construction of a detached ADU (DADU) in Seattle typically takes about 5 to 9 months on site.
  • A Seattle ADU permit application requires full architectural plans (SDCI Tips 103 + 106), structural calculations, a WSEC energy-compliance form, a site plan with setbacks, and King County sewer capacity certification.
  • Seattle SDCI collects 75% of plan-review and permit fees at application acceptance, and pre-approved DADU plans waive most plan-review fees.
  • Washington HB 1337 requires cities planning under the Growth Management Act to allow at least two ADUs on a lot in a single-family zone within the urban growth area, attached or detached in any combination, except on lots with critical areas or their buffers (RCW 36.70A.681), and bars owner-occupancy requirements.
  • State law bars a city from setting a maximum ADU size below 1,000 sq ft of gross floor area (RCW 36.70A.681(1)(f)). Many cities allow more: Seattle allows 1,000 sq ft, or 1,200 with three or more bedrooms (SMC 23.42.022); Bellevue allows 1,200 sq ft (LUC 20.20.120).

Sources: Seattle SDCI — Accessory Dwelling Units and Washington HB 1337 (2023), as verified in Kolmo Construction's permit rule data. Build-time range from Kolmo's 2026 estimating model — typical planning ranges, not a schedule commitment; complex sites (steep slopes, critical areas, long utility runs) run longer.

Which ADU type fits your parcel?

Two kinds, with different rules: the choice changes the setbacks, the size cap and parking.

DADU — Detached

A standalone backyard cottage. Own foundation, own roof, separate from the primary residence. Most flexibility on layout; highest construction cost.

  • No city maximum below 1,000 sq ft (RCW 36.70A.681)
  • Its distance from the house set by each city’s code, read for each address
  • Pre-approved plans in Seattle, Renton, Kirkland, Tacoma, Everett and Lynnwood

AADU — Attached

Inside or attached to the primary residence. Basement conversion, garage conversion, or a bump-out addition with kitchen + bath. Lower cost; tighter design constraints.

  • Inside the house, no new setback to meet; a bump-out keeps the zone’s setbacks
  • Egress windows required on every bedroom (IRC R310)
  • Typically the lowest cost per square foot

HB 1337 — what changed in 2023

Cities must allow two ADUs per lot

Washington House Bill 1337 (RCW 36.70A.681) requires cities and counties planning under the Growth Management Act to allow at least two accessory dwelling units on a lot in a single-family zone within the urban growth area, attached or detached in any combination. Lots with critical areas or their buffers are excepted.

No owner-occupancy gate

Cities can no longer require the owner to live on the property as a condition of permitting an ADU. Some still attach owner-occupancy strings to short-term-rental use (Airbnb / VRBO), but the permit itself cannot be denied on those grounds.

No maximum below 1,000 sq ft

A city may not cap an ADU below 1,000 sq ft of gross floor area. Many go higher (Bellevue: 1,200 sq ft; Seattle: 1,000 sq ft, or 1,200 with three or more bedrooms).

Off-street parking limits

Cities may not require off-street parking for an ADU within a half-mile walk of a major transit stop, more than one space per unit on a lot under 6,000 sq ft, or more than two on a larger lot.

Source: RCW 36.70A.681 (Washington HB 1337, 2023). City-specific rules cited on each city page below.

Pick your city

Verified ADU rules for 17 cities. Each city page covers max sizes, setbacks, parking, owner-occupancy posture, and HB 1337 conformance.

How packet generation works

  1. 1
    Resolve your parcel

    Enter your address. The page reads the lot’s lines, zoning, setbacks, mapped critical areas and the buildings already on it from county and city maps — no manual data entry.

  2. 2
    Pick a footprint

    Drop a sized ADU footprint on the plan of your lot and turn it to fit. The setback, lot-coverage and critical-area checks update as you drag — no guessing whether it fits.

  3. 3
    Generate the packet

    The engine assembles a city-filable packet: A1.1 site plan, A2.1 floor plan, A3.1 elevations, A4.1 foundation, A4.2 framing, A5.1 wall section, A6.0 glazing schedule, filled permit forms, Manual J energy compliance — every sheet cited to its source.

Common questions about ADU permits

What is the difference between an ADU, a DADU, and an AADU?

ADU (Accessory Dwelling Unit) is the family name. A DADU (Detached ADU) is a standalone backyard cottage. An AADU (Attached ADU) is built inside or attached to the primary residence — basement conversions, garage conversions, and bump-out additions all qualify.

Does Washington State allow ADUs on every single-family lot?

Nearly. Washington House Bill 1337 requires cities and counties planning under the Growth Management Act to allow at least two ADUs on a lot in a single-family zone within the urban growth area, attached or detached in any combination, except on lots with critical areas or their buffers (RCW 36.70A.681). Cities still set the specific size and setback rules.

How big can my DADU be?

State law bars a city from setting a maximum ADU size below 1,000 sq ft of gross floor area (RCW 36.70A.681(1)(f)). Many cities allow more: Seattle allows 1,000 sq ft, or 1,200 with three or more bedrooms (SMC 23.42.022); Bellevue allows 1,200 sq ft (LUC 20.20.120). Always check the specific city rule on the per-city page.

Do I need to live on the property to permit an ADU?

HB 1337 forbids cities from requiring owner occupancy as a condition for permitting an ADU. Some cities still attach owner-occupancy conditions for short-term-rental use (Airbnb / VRBO), but you cannot be denied a permit on owner-occupancy grounds alone.

How long does it take to build an ADU in Seattle?

For a pre-approved DADU plan SDCI says: "In most cases, you can get your permit in just 2-6 weeks." It publishes no typical review time for a custom ADU. After the permit is issued, construction of a detached ADU typically takes about 5 to 9 months on site. Complex sites (steep slopes, critical areas, long utility runs) run longer; these are typical planning ranges, not a schedule commitment.

What are the ADU permit requirements in Seattle?

Seattle permits attached and detached ADUs through an SDCI Construction Permit (Addition or Alteration); legalizing an existing unpermitted unit uses a Construction Permit Establishing Use. The application requires full architectural plans (SDCI Tips 103 + 106), structural calculations, a WSEC energy-compliance form, a site plan with setbacks, and King County sewer capacity certification. SDCI collects 75% of plan-review and permit fees at application acceptance, and pre-approved DADU plans waive most plan-review fees.

Which Seattle-area cities does Kolmo verify ADU rules for?

Kolmo personally verifies ADU rules for 17 cities: Seattle, Bellevue, Kirkland, Redmond, Sammamish, Issaquah, Renton, Kent, Federal Way, Mercer Island, Shoreline, Tacoma, Lakewood, Puyallup, Everett, Lynnwood, Woodinville. Other Washington jurisdictions resolve to baseline state rules; verified-city pages cite the local municipal code directly.

What is a pre-approved or standard-plan DADU?

Seattle SDCI maintains a library of pre-approved DADU plans whose architectural and structural review is already complete; the plans examiner checks the placement and site work. SDCI says: "In most cases, you can get your permit in just 2-6 weeks."