Detached ADU (DADU) Permits in Federal Way
A standalone backyard cottage with its own foundation, roof, and exterior. Maximum flexibility on layout; highest construction cost. State law bars a city maximum below 1,000 sq ft of gross floor area, except on lots with critical areas (RCW 36.70A.681).
Free lookup: your lot’s zoning and setbacks, with a detached ADU placed on it to move and turn.
Permit fees in Federal Way
Set by the Federal Way fee schedule.
Federal Way fee scheduleFederal Way prices an ADU's building permit on the value of the work (the ICC's building valuation data, or a bid the Building Official approves), off Valuation Table A: $1,531.67 for the first $50,000 plus $16.24 for each $1,000 more up to $100,000, and $2,343.58 for the first $100,000 plus $13.17 for each $1,000 more up to $500,000. Plan review is 65% of the building permit fee, single-family plans carry a $60 digitizing fee, and the $6.50 state building code fee and the automation fee (the greater of $43 or 5% of the permit fee) apply. The park impact fee for an ADU is $0.84 a square foot, $522 at the least and $2,624 at the most, plus the City's 5% administrative fee; the school impact fee for an ADU is $0 (2026 Fee Schedule).
Review timeline
Not published by Federal Way.
What Federal Way asks for with a detached ADU
Every application (19)
- Construction permit application, through the City's document upload link
- Single Family Residential Checklist, completed and initialed
- Certificate of Water Availability with fire flow calculations, from the water purveyor
- Certificate of Sewer Availability, or King County septic approval on a septic lot
- Fire access, hydrant distance and fire flow (South King Fire & Rescue), or fire sprinklers
- Site plan
- Tree retention plan with the tree unit calculation (FWRC 19.120.130)
- Drainage and erosion control plan
The other 11
- Foundation plan
- Floor plan
- Roof plan
- Roof + floor framing plan
- Typical building / wall section
- Building elevations N/S/E/W
- Glazing + door schedule (NFRC U-factor / SHGC)
- Structural design notes (loads, materials, inspections)
- Major materials schedule
- WSEC energy compliance, on the plans
- WSEC-R compliance forms (WSU Energy Program), uploaded as a PDF
Where the lot or the work calls for it
Where the lot has a steep slope, is in a landslide hazard area or is in a seismic hazard area
- Structural calculations, stamped by a Washington professional engineer
Each where the condition beside it holds
- Soils infiltration report (2,000 sq ft of new impervious area, on a lot under 22,000 sq ft or one proposing infiltration)
From the city’s own documents: City of Federal Way — Permit Center · City of Federal Way — Single Family Residential Checklist, Bulletin #106 (February 23, 2026) · City of Federal Way — Accessory Dwelling Unit (ADU) Informational Handout, Bulletin #048 (June 2025) and 2 more, last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.