Attached ADU (AADU) Permits in Kent
An ADU built inside or attached to the primary residence — basement conversion, garage conversion, or bump-out addition. Lower cost; constrained by the primary footprint.
Free lookup: your lot’s zoning and setbacks, with an attached ADU placed on it to move and turn.
Permit fees in Kent
Set by the Kent fee schedule.
Kent fee scheduleKent charges no separate land use fee for an ADU; it is priced with its building permit, on the value of the work: $881.32 for the first $25,000 plus $22.75 for each $1,000 more up to $50,000, $1,450.35 for the first $50,000 plus $15.78 for each $1,000 more up to $100,000, and $2,238.81 for the first $100,000 plus $12.64 for each $1,000 more up to $500,000. Intake fees are billed once the submittal is complete, and the rest before the permit issues. The plumbing and mechanical permits are priced separately, and the City's posted fee documents (its 2026 building permit fee table and land use fees) list neither, so the Permit Center (253-856-5300) quotes them. Electrical permits come from L&I, at L&I's fees. The traffic impact fee schedule the City posts (effective 2025) charges none for a lot's first ADU and $3,054.63 citywide for a second or later one. Apply through the City of Kent Permit Portal (sso.kentwa.gov).
Review timeline
Not published by Kent.
What Kent asks for with an attached ADU
Every application (10)
- ADU permit application (Kent Planning Services)
- Residential building permit application (Kent permitting portal)
- Legal description of the property (King County)
- Water and sewer availability certificates, from the lot's utility purveyors
- Notice of Shared Utilities, recorded (where the ADU shares the house's utilities)
- King County Residential Sewer Use Certification (capacity charge)
- Site plan
- Floor plan
- One-hour fire-resistive separation between the units, detailed
- Plan sheets 24×36 or larger, landscape, with space reserved for City approval stamps
Where the lot or the work calls for it
Where the ADU adds onto the house or changes its structure
- Fire flow form, from the water purveyor
- Fire Impact Fee Information Sheet
- Roof downspout infiltration trench (Kent Standard Plan 5-26), on the site plan
- Structural calculations, stamped by a Washington licensed engineer
Where the ADU adds onto the house or changes its outside walls, windows or roof
- Typical building / wall section
- Building elevations N/S/E/W
- Major materials schedule
Where the work changes the outside walls, windows or roof
- Glazing + door schedule (NFRC U-factor / SHGC)
- WSEC energy compliance, on the plans
- WSEC-R forms (WSU Energy Program), in the drawings
Where the ADU adds onto the house or changes its structure, and where the lot has a steep slope
- Soils report by a Washington licensed geotechnical engineer
Where the ADU adds onto the house or changes its structure, and where the lot is in a flood zone
- Flood-resistant construction to IRC R322 (designated flood area)
From the city’s own documents: City of Kent — Accessory Dwelling Unit Permit Checklist (9/27/24) · City of Kent — New Residences and Additions Checklist (4/26), last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.
AADU-specific requirements
- Egress on every bedroom — IRC R310 net clear opening ≥5.7 sf; sill ≤44″ from floor.
- Smoke + CO alarms — interconnected throughout primary + AADU per IRC R314/R315.
- 1-hr separation — required between AADU and primary in some cases; otherwise a continuous draft stop.
- Independent kitchen + bath — full plumbing + cooking provision in the AADU.
- Address or unit number — the city or county assigns addresses; ask the permit center whether the unit gets its own.