Attached ADU (AADU) Permits in Sammamish

An ADU built inside or attached to the primary residence — basement conversion, garage conversion, or bump-out addition. Lower cost; constrained by the primary footprint.

Free lookup: your lot’s zoning and setbacks, with an attached ADU placed on it to move and turn.

Permit fees in Sammamish

Set by the Sammamish fee schedule.

Sammamish fee schedule

Sammamish prices an ADU's building permit on the value of the work: $994.39 for the first $50,000 plus $5.68 for each $1,000 more up to $100,000, and $1,278.51 for the first $100,000 plus $8.65 for each $1,000 more up to $500,000, with plan review at 65% of the permit fee. Planning's review of the building application is $1,578 for new construction and $753 for an addition or remodel; Public Works' review of a new house or ADU in a critical area is $2,248, and its concurrency test for a house or ADU $280. The City adds a 15% technology fee to each fee (2026 Fee Schedule). Apply via mybuildingpermit.com.

Review timeline

Not published by Sammamish.

What Sammamish asks for with an attached ADU

Every application (18)

  • Building Permit Application, at MyBuildingPermit (Addition Building Permit)
  • Acceptance of Financial Responsibility - Affidavit of Applicant Status
  • Critical Areas Affidavit
  • Historic Resources Affidavit
  • Traffic Concurrency Certificate
  • Sewer Availability Certificate (Sammamish Plateau Water or Northeast Sammamish Sewer & Water)
  • Water Availability Certificate (Sammamish Plateau Water or Northeast Sammamish Water & Sewer)
  • Water Meter Sizing Form, where Sammamish Plateau Water serves the lot
The other 10
  • Residential Fixture Count form
  • Legal description of the parcel (King County)
  • Project Narrative
  • City of Sammamish Plan Set Coversheet (2021), first sheet of the plan set
  • Site plan
  • Site Protection Plan
  • Residential Drainage Review Checklist (Public Works)
  • Floor plan
  • WSEC energy compliance, prescriptive path
  • WSEC compliance: the City's Prescriptive Compliance Form, or the Component Performance Worksheet

Where the lot or the work calls for it

Where the ADU adds onto the house or changes its outside walls, windows or roof

  • Typical building / wall section
  • Building elevations N/S/E/W
  • Major materials schedule

Where the work changes the outside walls, windows or roof

  • Glazing + door schedule (NFRC U-factor / SHGC)

Where the ADU adds onto the house or changes its structure

  • Structural Calculations

From 2,000 sq ft of new hard surface, or where the lot is in a flood zone

  • Storm Drainage Analysis: Written Drainage Assessment or Technical Information Report

From the city’s own documents: City of Sammamish — Building Permit Application (2024-4-BLDPA) · City of Sammamish — Submittal Checklist: Residential Addition (2025-02-ADDN) · City of Sammamish — Residential Single-Family Plan Set Coversheet (2021) and 2 more, last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.

The other 2 documents

AADU-specific requirements

  • Egress on every bedroom — IRC R310 net clear opening ≥5.7 sf; sill ≤44″ from floor.
  • Smoke + CO alarms — interconnected throughout primary + AADU per IRC R314/R315.
  • 1-hr separation — required between AADU and primary in some cases; otherwise a continuous draft stop.
  • Independent kitchen + bath — full plumbing + cooking provision in the AADU.
  • Address or unit number — the city or county assigns addresses; ask the permit center whether the unit gets its own.