Detached ADU (DADU) Permits in Sammamish

A standalone backyard cottage with its own foundation, roof, and exterior. Maximum flexibility on layout; highest construction cost. State law bars a city maximum below 1,000 sq ft of gross floor area, except on lots with critical areas (RCW 36.70A.681).

Free lookup: your lot’s zoning and setbacks, with a detached ADU placed on it to move and turn.

Permit fees in Sammamish

Set by the Sammamish fee schedule.

Sammamish fee schedule

Sammamish prices an ADU's building permit on the value of the work: $994.39 for the first $50,000 plus $5.68 for each $1,000 more up to $100,000, and $1,278.51 for the first $100,000 plus $8.65 for each $1,000 more up to $500,000, with plan review at 65% of the permit fee. Planning's review of the building application is $1,578 for new construction and $753 for an addition or remodel; Public Works' review of a new house or ADU in a critical area is $2,248, and its concurrency test for a house or ADU $280. The City adds a 15% technology fee to each fee (2026 Fee Schedule). Apply via mybuildingpermit.com.

Review timeline

Not published by Sammamish.

What Sammamish asks for with a detached ADU

Every application (26)

  • Building Permit Application, at MyBuildingPermit (Accessory Structure Building Permit)
  • Acceptance of Financial Responsibility - Affidavit of Applicant Status
  • Critical Areas Affidavit
  • Historic Resources Affidavit
  • Traffic Concurrency Certificate
  • Sewer Availability Certificate (Sammamish Plateau Water or Northeast Sammamish Sewer & Water)
  • Water Availability Certificate (Sammamish Plateau Water or Northeast Sammamish Water & Sewer)
  • Water Meter Sizing Form, where Sammamish Plateau Water serves the lot
The other 18
  • Residential Fixture Count form
  • Legal description of the parcel (King County)
  • Project Narrative
  • City of Sammamish Plan Set Coversheet (2021), first sheet of the plan set
  • Site plan
  • Site Protection Plan
  • Residential Drainage Review Checklist (Public Works)
  • Foundation plan
  • Floor plan
  • Roof + floor framing plan
  • Typical building / wall section
  • Building elevations N/S/E/W
  • Glazing + door schedule (NFRC U-factor / SHGC)
  • Structural design notes (loads, materials, inspections)
  • Major materials schedule
  • Structural Calculations
  • WSEC energy compliance, prescriptive path
  • WSEC compliance: the City's Prescriptive Compliance Form, or the Component Performance Worksheet

Where the lot or the work calls for it

From 2,000 sq ft of new hard surface, or where the lot is in a flood zone

  • Storm Drainage Analysis: Written Drainage Assessment or Technical Information Report

From the city’s own documents: City of Sammamish — Building Permit Application (2024-4-BLDPA) · City of Sammamish — Submittal Checklist: Residential Addition (2025-02-ADDN) · City of Sammamish — Residential Single-Family Plan Set Coversheet (2021) and 2 more, last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.

The other 2 documents