Attached ADU (AADU) Permits in Seattle

An ADU built inside or attached to the primary residence — basement conversion, garage conversion, or bump-out addition. Lower cost; constrained by the primary footprint.

Free lookup: your lot’s zoning and setbacks, with an attached ADU placed on it to move and turn.

Permit fees in Seattle

Set by the Seattle fee schedule.

Seattle fee schedule

Where an ADU or DADU needs an SDCI permit, it is a construction permit with full plan review. SDCI prices the building permit on the value of the work through its Development Fee Index: $1,821.50 for the first $100,000, plus $7.75 for each $1,000 more to $250,000 and $7.50 per $1,000 to $500,000 ($2,984 at $250,000). With full plan review, the permit fee and the plan review fee are each 100% of the index, minimum $292; half the permit fee and all of the plan review fee are due at application. A 5% technology fee is added to every SDCI fee, and the state building code fee is $6.50 on a residential permit (SMC 22.900; RCW 19.27.085). A $250,000 DADU comes to about $6,273 before trade permits, drainage review and the side sewer permit. SDCI, not L&I, issues the electrical permit: $26.28 for each new or altered branch circuit up to 25 amps and $43.80 for 30 to 50 amps, plus a $55.48 administrative fee, minimum $105.12. Plumbing and gas piping permits come from Public Health – Seattle & King County, which sets and collects their fees.

Review timeline

Measured, attached ADU: half issued within 107 days of application, 80% within 22555 permits, last 12 months. Source: City of Seattle issued building permits, data.seattle.gov dataset 76t5-zqzr.

What Seattle asks for with an attached ADU

Every application (8)

  • SDCI Screening & Submittal Checklist, Single Family Addition & Alteration (filled cover sheet)
  • Statement of Financial Responsibility / Agent Authorization
  • King County sewage treatment capacity charge form
  • Site plan: address
  • Site plan: legal description
  • Site plan: KC Assessor parcel number
  • Floor plan — existing AND proposed (AADU within existing structure)
  • SDCI Energy Code STFI Checklist

From the city’s own documents: SDCI Screening & Submittal Checklist — Single Family Addition & Alteration (form) · SDCI Statement of Financial Responsibility / Agent Authorization (form, updated 04/07/2025) · Tip 116A · Tip 103, last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.

AADU-specific requirements

  • Egress on every bedroom — IRC R310 net clear opening ≥5.7 sf; sill ≤44″ from floor.
  • Smoke + CO alarms — interconnected throughout primary + AADU per IRC R314/R315.
  • 1-hr separation — required between AADU and primary in some cases; otherwise a continuous draft stop.
  • Independent kitchen + bath — full plumbing + cooking provision in the AADU.
  • Address or unit number — the city or county assigns addresses; ask the permit center whether the unit gets its own.