Detached ADU (DADU) Permits in Seattle
A standalone backyard cottage with its own foundation, roof, and exterior. Maximum flexibility on layout; highest construction cost. State law bars a city maximum below 1,000 sq ft of gross floor area, except on lots with critical areas (RCW 36.70A.681).
Free lookup: your lot’s zoning and setbacks, with a detached ADU placed on it to move and turn.
Permit fees in Seattle
Set by the Seattle fee schedule.
Seattle fee scheduleWhere an ADU or DADU needs an SDCI permit, it is a construction permit with full plan review. SDCI prices the building permit on the value of the work through its Development Fee Index: $1,821.50 for the first $100,000, plus $7.75 for each $1,000 more to $250,000 and $7.50 per $1,000 to $500,000 ($2,984 at $250,000). With full plan review, the permit fee and the plan review fee are each 100% of the index, minimum $292; half the permit fee and all of the plan review fee are due at application. A 5% technology fee is added to every SDCI fee, and the state building code fee is $6.50 on a residential permit (SMC 22.900; RCW 19.27.085). A $250,000 DADU comes to about $6,273 before trade permits, drainage review and the side sewer permit. SDCI, not L&I, issues the electrical permit: $26.28 for each new or altered branch circuit up to 25 amps and $43.80 for 30 to 50 amps, plus a $55.48 administrative fee, minimum $105.12. Plumbing and gas piping permits come from Public Health – Seattle & King County, which sets and collects their fees.
Review timeline
Measured, detached ADU: half issued within 109 days of application, 80% within 204233 permits, last 12 months. Source: City of Seattle issued building permits, data.seattle.gov dataset 76t5-zqzr.
What Seattle asks for with a detached ADU
Every application (22)
- SDCI Screening & Submittal Checklist, Single Family Addition & Alteration (filled cover sheet)
- Statement of Financial Responsibility / Agent Authorization
- King County sewage treatment capacity charge — Residential Sewer Use Certification
- Site plan: address
- Site plan: legal description
- Site plan: KC Assessor parcel number
- Site plan: north arrow
- Site plan: property lines and dimensions (existing and proposed)
The other 14
- Site plan: existing and proposed structures
- Site plan: setback dimensions to property lines and between structures
- Site plan: rights-of-way and adjacent street/alley names
- Site plan: driveways, parking areas, and other paved areas
- DADU size and setback compliance check
- Foundation plan
- Floor plan
- Roof and floor framing plan
- Typical building / wall section
- Building elevations (N/S/E/W) with grade callouts
- Glazing + opaque door schedule (NFRC-compliant)
- Structural design notes (loads, materials, inspections)
- Major materials schedule
- Heating Equipment Sizing Calculation (Manual J)
Where the lot or the work calls for it
From 750 sq ft of new hard surface
- Drainage Plan
- On-Site Stormwater List Worksheet
Under 5,000 sq ft of new hard surface
- Construction Stormwater Control and Soil Management (CSC/SOIL) Plan — SDCI Small Project Standard Plan
From the city’s own documents: SDCI Screening & Submittal Checklist — Single Family Addition & Alteration (form) · SDCI Statement of Financial Responsibility / Agent Authorization (form, updated 04/07/2025) · Tip 116B and 5 more, last read October 24, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.