Attached ADU (AADU) Permits in Bellevue
An ADU built inside or attached to the primary residence — basement conversion, garage conversion, or bump-out addition. Lower cost; constrained by the primary footprint.
Free lookup: your lot’s zoning and setbacks, with an attached ADU placed on it to move and turn.
Permit fees in Bellevue
Set by the Bellevue fee schedule.
Bellevue fee scheduleBellevue prices an ADU's building permit on the value of the work: $728.65 for the first $25,000 plus $19.06 for each $1,000 more up to $50,000, $1,205.15 for the first $50,000 plus $12.33 for each $1,000 more up to $100,000, and $1,821.65 for the first $100,000 plus $10.77 for each $1,000 more up to $1,000,000, each prorated. Plan review is 65% of that fee and the operations fee $53 (Ordinance 6879), and the state building code fee is $6.50 on a residential permit (RCW 19.27.085). Land use, utility, transportation and clearing and grading reviews add their own fees by permit type (Ordinance 6879, Tables 13, 20, 22 and 25). The school impact fee on an ADU is half the principal unit's, and the Issaquah and Renton school districts' fees under the ordinance are $0. Bellevue issues its own electrical permits, priced on the value of the electrical work, $79 up to $500. Apply via mybuildingpermit.com.
Review timeline
Typical: 21–90 business days
What Bellevue asks for with an attached ADU
Every application (4)
- MyBuildingPermit application
- Floor plan
- WSEC energy compliance, prescriptive path
- Energy code compliance forms (WSU), such as the Code Compliance Calculator
Where the lot or the work calls for it
Where the ADU adds onto the house or changes its outside walls, windows or roof
- Typical building / wall section
- Building elevations N/S/E/W
- Major materials schedule
Where the work changes the outside walls, windows or roof
- Glazing + door schedule (NFRC U-factor / SHGC)
From the city’s own documents: City of Bellevue — Single-Family Remodel Permit (BU permit) · City of Bellevue Plan Submittal Resources — Architectural Plan, last read October 21, 2026. An address’s own page checks its lot for slopes, flood zones and critical areas.
AADU-specific requirements
- Egress on every bedroom — IRC R310 net clear opening ≥5.7 sf; sill ≤44″ from floor.
- Smoke + CO alarms — interconnected throughout primary + AADU per IRC R314/R315.
- 1-hr separation — required between AADU and primary in some cases; otherwise a continuous draft stop.
- Independent kitchen + bath — full plumbing + cooking provision in the AADU.
- Address or unit number — the city or county assigns addresses; ask the permit center whether the unit gets its own.